SHENDIAO TOWER CRANE TC6020A

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

RVF + orientation
The RVF Optima + orientation enables gentle rotating movements without jerking.
Fully integrated progressive control.
Driving adapts to the behavior of the crane operator:
•  Traditional driving thanks to action controlled by stoppage of the command. The slow-down phase of the jib is managed by the frequency variator in this case.
•  Or by an inverted command in the slow-down phase, called a «counter-orientation» command.
As a result, the crane operator can control stoppage.

The design of the electric sockets allows simple and quick connectionon all sites.
Whilst operating or transporting, the cables are integrated and/or stored easily in the crane, increasing the service life of the electrical equipment and providing optimal conditions of safety.
•  There is a special channel for electric wiring in the counter-jib.

Considered to be the parent range to tower cranes,
MD cranes have been around since the beginnings of the Potain brand. This range is the pillar of all Potain product know-how.
Constantly evolving to meet market expectations, these cranes are equipped with the latest technological innovations and boast the best performance possible.

Technical characteristics
•  Jib lengths of between 30 m and 80 m, per 5 m section.
•  Max. load of 10 to 40 t.
•  Hoisting power ranging from between 50 and 150 horsepower.
•  The masts used are K400 (1.6 m), K600 (2 m), K800 (2.45 m) and K850 (2.45 m, reinforced).

All the components of the MD range are designed to minimize the total number of trucksrequired to transport them between sites.

The jib components can house the jib tiesto make transport easier and quicker.

Thanks to the factory-performed pre-reeving and the auxiliary winch supplied as standard, assembly of the jib and counter-jib ties can be carried out quickly and in total safety.

The mechanisms are always used at full power. When hoisting, the speed is optimized according to the load and command used. In distribution, progressive variation of speedand the maximum speed are adapted to the weight of the load. In orientation, there is controlled proportionalspeed with optimal acceleration and deceleration in accordance
with the maximum admissible torque for the mast.

The auxiliary winch can be used on the derrick: this provides users with the possibility of a motorized derrick at the base of the machine.

DVF Distribution
The jib-footDVF mechanism is easily accessible in total safety.
Progressive speed variation by proportional control.
The speed depends directly on the controls manipulated by the crane operator.
To make driving the crane easier, 2 hard spots integrated into the controlsprovide better pinpointing of the speed.

With different mechanisms (33 to 150 LVF Optima or 108 to 215 hp LBR), MD cranes are capable of high working speeds through optimizing speed in accordance with the load hoisted, allowing for gains in productivity.
•  For the first increments (approach speed, sling tension, etc.) hoisting of the load is controlled by the load security
device (a proving ring).
•  For working speeds, the Optima system adapts the speed in accordance with the load hoisted. This enables full power of the motor to always be used for optimum productivity.
The LVF Optima provides a gain of around 25% in descending speed.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Cranes everywhere in a city?
I love doing things like this! Whenever my friends go to the mall we do this. We put inspirational quotes and images everywhere we can. In the pockets of clothing, on top of the sale signs, all over the cafeteria. There isn't anything wrong with doing it, and people love it! I'm sure the cranes will be beautiful and many people will appreciate them. Be sure to write look inside on the outside of each crane if you're hiding the message on the inside! This is such a cool idea, I'd love it and I'm sure it won't even be a slight nuisance to anyone. Have fun!
Q: why use 'and to also making the cranes', not 'to also make the cranes'?
I personally would write it as... So, we decided to do a show on the earthquake and to make origami cranes. However, for proper English grammar, your idea of saying to also make the cranes is correct for an addition with and. The sentence fragment ... and to also making the cranes... would not work because also is a interrupter to show continuation and is not a verb. To make is an infinitive so adding also would not allow the conjugation of the infinitive due to the rule that a verb cannot follow a verb unless if the second verb is in an infinitive form. And is never used with commas unless there are items in series such as ducks, chickens, and hens. And is not correct after a comma unless if there are items in series. In addition, the items in series rule can change slightly if there is a description with the items or a sentence fragment such as with the sentence... There are several large hens with an egg; a few with large wings; and a few with a large pile of food. In this situation a semicolon(;) is used to help people know that it is a series with a group of sentence fragments. If you need help contact me or find help with items in series, types of sentences, sentence fragments, and sentence interrupters. I am learning to speak Spanish so I am willing to help anyone with English because I know how difficult it can be to learn English.
Q:Does my truck support this mounted-crane?
Check what the hydralic specs. of the crane are. Then see if your truck pump can supply the output pressures and volume.
Q:How's electricity delivered to Overhead Cranes?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q:Is there a world record for making paper cranes?
It's said that if you fold 1 thousand paper cranes in a year you get a wish. By february I had 245 done....so I quit. lol
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:do you know how to make an origami paper crane?
Go to Howcast and type in origami.It taught me how to fold like a pro.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:A crane lifts a 425 kg steel beam vertically a distance of 117m?
You have the right idea, the answer is d. EDIT: Well I actually read the rest of the question (sometimes I get an itchy trigger finger!), and the net force should be found first, the net force includes the weight and the tension in the crane's cable (so you need to find the tension): ∑F = ma = T - mg T = m(a + g) = 425kg(1.80m/s² + 9.80m/s²) = 4930N So the net force is the sum of the tension in the cable and the weight of the beam, or: F = T - mg = 4930N - (425kg)(9.80m/s²) = 735N Then, the work done by the crane is: W = FΔy = 735N(117m) = 8.95 x 10^4J Does not match any of your choices, so I am perplexed! Maybe someone will straighten me out. Apologies if I failed to help.
Q:How the Tower Cranes becomes longer or Shorter?
The crane isn't growing. The cranes lift themselves up to the current top floor, build up around them, and repeat as necessary until they reach the top. The tallest cranes in the world are nowhere near as tall as the tallest skyscrapers - so the only mechanism to build very tall structures is to keep the cranes at the top of the building as it rises.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range