SHENDIAO CONSTRUCTION HOISTS SC100/100

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The assembly, erection, transport and even maintenance times are reduced, and as a result this helps to keep operating costs low.
Optimum productivity and greater safety make MDT Topless cranes the best alternative for all users or hirers.

Elegance and distinction
Their new shape is easy to distinguish from a distance.
The counter-jib projects a dynamic and refined design and the profiled jib, with a regular inclination, shows a fluid and
elegant line.

Minimized, compact and light package
Transport and erection
The shapes, dimensions and weights of the components were devised right from the design stage to scale-down the
package and save time. Only a single, small, mobile crane is required to hoist the packages and assemble them.

Assembly of the
counter-jib on the
ground
The compact counter-jib has a reduced footprint, ballast supports and
stabilizer plates designed to be folded
away for transport.
The nose and stabilizer plates can be
simply unfolded which releases the
guardrails.
Assembly of the jib on the ground
Operation of crane fleets can be optimized thanks to the possibility of exchanging certain components of the crane jib with other models from the same range

Counter-jib ballast blocks with inclined bases are used for simpler dismantling on the ground, since they can be laid down easily.
No locking mechanisms are necessary, and the counter-jib can be unfolded easily.

Pinning is quick and simple thanks to the centering pins of the splice.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

Trolleying with variablefrequency, progressive speed by means of stepless control.

The masts adopt the standard bases from the MC range, allowing it to be adjusted to the desired height.
The adjustable bases are of the same type as those of the MC crane range, providing a choice of method of installation:
• on fixing angles,
• on cross-shaped base,
• on travelling gear,
• or as a climbing crane.
For easier management of your crane fleet, the standard elements taken from the MC range are assembled using pinned fish joints for ease and speed of connection.

MCT cranes are available with a wide range of optional features:
• Vision cab with or without air-conditioning
• Dialog VISU indicators
• Dialog Wind anemometer
• Top Tracing interference control and zone limitation system
• Remote control unit with indicator
• Automatic cartridge lubrication
• Auxiliary winch

• 5 models.
• Jib lengths from 40 m to 52 m.
• Maximum load from 2.5 to 5 tons.
• Maximum hoisting speeds from 2.8 to 82 m/min.

Fitted with jib lengths ranging from 55 to 65 m, the MDT Topless cranes boast hoisting capacities of 6 to 10 t.
Providing a suitable size for all your needs.
They allow complex multi-crane installations by considerablyreducing the height gaps and interference of cranes on work sites.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Calculate the tower crane gantry crane
Is building gantry crane crane, gantry crane is generally used for the port, port crane. Can not be regarded as the tower crane.There are several common types of cranes: overhead cranes, gantry cranes, port cranes, automobile cranes, tower cranes, etc..Gantry crane is a medium and small cantilever crane with simple Longmen.
Q:Who invented the tower crane, please?
In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
The rental price of tower crane consists of the cost of advance and retreat yard and the monthly rent of tower crane. The cost of the advance and retreat yard includes the loading and unloading costs, transportation costs, installation costs and monitoring expenses of the tower crane. The rent of the tower crane includes the cost of tower cranes, the cost of tower crane maintenance and the wages of the crane drivers. At present, many sites are using lease way to use tower cranes, so that the occupation of the site will be less rent, investment will be relatively small.
Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
Q:What are the types of common tower cranes?
Tower crane, tower crane. Tower crane according to its different types, there are the following classification methods.(1) according to the structural typeThe fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.Mobile tower crane: a tower crane with running device and can walk. According to the running device, it can be divided into rail type, tyre type and caterpillar type.
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
2 the tower crane without counterweight is mainly the city fast loading tower crane. It is characterized by the absence of balance arm, and it is impossible to have counterweightThe layman can not tell the can see the appearance, there are long steel structure before and after the weight of the tower body, and no weight of the tower body with only one steel structure (i.e. jib crane, structure)
Q:Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range