self propelled telescopic boom lift GTBZ26/28

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Brief Introduction

CE self propelled telescopic boom lift GTBZ can drive flexibly and freely, with wide working scope and high efficiency. Hydraulic motor realize 40% gradeability through planetary reduction box. Telescopic boom and cylinders are protected with dust proof jacket to prevent dust in. The round glossy shape boom and chassis is not easily dirty with dust. Length and angle of boom are monitored real time by length sensor and angle sensor. Protection level of electrical system is above IP65. With great outreach, the boom lift can work in large scope continuously. 2 wheels drive and 4 wheels drive, 2 wheels steering and 4 wheels steering are optional. It is especially good for shipbuilding, ship maintenance, building construction, steel structure fixing, and bridge construction and so on.

Specification

Model

GTBZ26

GTBZ28

Size

Max. working height (m)

28.2

29.1

Max. platform height (m)

26.5

27.4

Horizontal reach (m)

24.2

25.1

Length - stowed (m)

11.4

11

Width stowed (m)

2.5

2.5

Height stowed (m)

3.05

3.05

Platform Length (mm)

1800

1800

Platform width (mm)

760

760

Platform Height (mm)

1170

1170

Axle base (m)

3.2

3.2

Ground clearance (mm)

370

370

Performance

Lifting capacity (kg)

270

230

Platform rotation

±80°

±80°

Turntable rotation

360° continuous

360° continuous

Turntable tailswing radius (mm) - wheel retracted

1315

1315

Turntable tailswing radius (mm) - wheel extended

915

915

Drive speed - stowed (km/h)

7.2

7.2

Drive speed - extended (km/h)

1.2

1.2

Gradeability

40%

40%

Turning radius - inside (m)

7.2

5.25

Turning radius - outside (m)

8.45

9.3

Controls

DC proportional

DC proportional

Telescopic method

In sequence+
Synchronous

In sequence+
Synchronous

Tires size

385/65-22.5

385/65-22.5

Power

power source

Perkins    64kW

Perkins    64kW

Voltage

12V

12V

Hydraulic oil volume (L)

280

280

Fuel oil volume (L)

126

126

Machine weight (t)

17.4

17.5

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:History of Chinese machinery development
Xia Xia ago and has not appeared in the Quan spoke and wheel spokes are two wheelers; Shang and Zhou Dynasty there was quite a sophisticated; canoe and raft and other water transport has long appeared. The late Neolithic period, people have been able to use tools and weapons of stone and mud casting a fan. During the Shang and Qing Dynasties, with the development of handicraft industry and the improvement of technical level, a splendid bronze culture was formed
Q:What are the employment trends of mechanical majors?
To see how the capacity and diploma, the operation is the most low-end equipment, engage in the end of the design, high-end R & D. But for many years working experience: 1 draw two school stuff, can come in handy in the minority, 2 work is difficult. So. The best situation is school you can stuff later undertaking to lay the foundation.
Q:What are the standards in the machinery industry?
International ISO, China GB, JB, Germany DIN. Japan JIS, ASTM STD-, ASTM standards, ANSI STD- American Standards Institute standards
Q:What subjects are specialized in mechanical manufacturing in secondary schools?
[] [mechanical drawing machine design foundation [] [] engineering mechanical hydraulic and hydraulic transmission] [] "mechanical manufacturing technology of NC machining materials" "special processing" technology is still the main focuses on the operation, so there will be a variety of training etc.
Q:The mechanical engineer applies for the condition English to say is must four above, but I did not achieve 4 levels, may have other ways
Mechanical engineer examination, national and local, local is generally relatively simple, the country's more difficult. To get an engineer is one thing, the company is willing to hire you as an engineer, but on the other hand. Even if you pass the exam and get the engineer's certificate, you will not be hired by the enterprise as an engineer. State regulations are 3 years after graduation, you can take an engineer, but some large enterprises are working, 5 years later hired as an engineer.
Q:Can a private project manage the construction machinery?
To this end, Yan Ping put forward from the introduction of the national level to strengthen the relevant standards of construction machinery industry management laws and regulations, clear responsibilities and rights, make the construction machinery management mode gradually move closer to the vehicle management system, and promote the healthy development of the construction machinery industry Chinese.
Q:What is the relationship between XCMG, construction machinery, Limited by Share Ltd and Xuzhou Construction Machellonery Group Inc?
The name of XCMG construction machinery Limited by Share Ltd, you can see the front of the two words is a stake in Xugong Group and the middle, the company is a listed company under the Xugong Group, referred to as Xugong Xugong Group, because not all listed, so the company is a company which XCMG group as a whole.
Q:Other Xuzhou Construction Machellonery Group Inc related
Xugong Group actively facing the domestic and foreign market turbulence situation, seize the state has increased investment and regional economic planning investment opportunities, vigorously transformation of operation mode and growth mode, accelerating the pace of industrial upgrading, has achieved four consecutive years of net increase of over 10 billion yuan, the scale of annual profit tax 3 times the speed of xugong".
Q:What are the five major cost components of the project cost?
Labor costs, material costs, machinery fees, other direct fees, indirect fees (including temporary facilities and on-site management fees)
Q:What's the level of the construction machinery in China?
Listen to the friend said the quality of excavator 31, or less than Komatsu Xugong, Caterpillar, but the price is a lot cheaper ah, do not know how sales

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range