Scafold Gray Flame Heavy Duty Adjustable Caster

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

1.Shock absorption
2.Acid, oil resistant
3.Wear-resistant
4.Large load capacity
5.More durable

 

Product Description

1.Double ball bearing caster wheel 007 series.

2.Large load capacity can make sure the goods not easy to topple over, can move steadly.

3.It is widely used on moveable equipments,business,logistics and transportation etc.

Model No.Diameter(mm)Tread Width(mm)MaterialLoad Capacity(kg)BearingLoad Height(mm)Top Plate Size(mm)Hole Spacing(mm)Hole Size(mm)
007-4"10050PU/PVC250Cylindrical Roller143115*10084*7220*11
007-5"12550PU/PVC270Cylindrical Roller164115*10084*7220*11
007-6"15050PU/PVC300Cylindrical Roller190115*10084*7220*11
007-8"20050PU/PVC340Cylindrical Roller242115*10084*7220*11

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
York Minster Scaffolding
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:Scaffold removal should comply with those requirements......
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:How old do u have to be to get a Scaffolding piesrcing ?
I have one and im 12. Im from Tennessee.
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!
Q:The basic form of external scaffolding
Basic structureA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range