scaffolding materials of jack base high quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Base Jack Description 

Base Jack is the Part of Scaffolding

2.We can supply high quality scaffolding systems, frame systems, props and shoring systems.

Features: 

  • Length: 0.5m-0.8m, 0.6m-1.0m, 0.7m-1.2m, 1m-1.8m, 1.6m-2.5m, 1.6m-2.9m, 1.6m-3.0m, 1.7m- 3.1m, 1.8m-3.2m, 2.0m-3.5m, 2.0m-3.6m, 2.2m-4.0m, 3.2m-4.8m, 3.5m-5.0m, etc.

  • Pipe Thickness: from 1.5mm to 5.0mm

  • Finish: hot dip galvanizing, galvanization, powder coating, painting, zinc plating

  • Outer packing: wooden Pallet, Bundle, seaworthy wooden case, plastic bag or According to customers' needs

  • Material/steel grade: Q235 -Q345

  • we can supply all of sizes according to customers demand or drawing.

 

3.Picture of Base Jack

scaffolding materials of jack base  high quality

 

 4.What about the package and shipping time?

  1)Packing:  As Customer's Requirements

  2)Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

3)Shipping time:

Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:I Just got an industrial piercing or Scaffold and im worried it might get infected?
Keeping it cleanis the only thing you really can do. Insteas of contact solution you could use a non iodized sea salt soak (1/8 teaspoon of sea salt to 8 oz of warm water). But you are going to want to stop spinning it. Spinning it could rip your fistula and prolong the healing time of the piercing
Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(1) main componentComponent for forming the main body of a scaffold. The vertical rod and the top rod are respectively provided with two kinds of specifications, and both sides of the rod are welded with a lower bowl buckle with a spacing of 600mm. If the vertical rod and the ejector rod are matched with each other for long use, the utility model can form an arbitrary height scaffold. Take a long pole, the joints should be staggered, the top layer and then leveling rod length two.
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:Piercing question: How do I know what size industrial/scaffold bar to get?
Please ignore the the bigger the better idea. A longer bar can be as bad in an industrial piercing as a shorter bar can be. It really depends on what size you were pierced with...16g o 14g. Industrial piercings are typically done at 14g, 16g would be too small. The length depends on your anatomy...you really should go to a professional piercer to get the bar put in since your piercings aren't completely healed. That way everything can be 100% sterile and they will be able to fit the proper length of jewelry into your ear.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
It only really hurt for the first month-ish but was really tender for the first 3 months. After that, I barely noticed it was there. Goodluck :]
Q:What issues need to pay attention to the construction of high-level scaffolding
To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
Q:What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range