scaffolding girder couplers steel

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
TIA,Tianjin China (Mainland) China (Mainland)


Model Number:
1
Type:
Scaffolding Parts
Weigh:
0.95-1.05kg or as per your request
material:
material
Surface:
Galvanized / painted
Scaffolding Part Type:
Scaffolding Couplers
Processes:
drop forged / pressed
Style:
British/German/ Korean/ Japanese etc.
Certification:
ISO9001:2008

Packaging & Delivery

Packaging Detail:Plastic bags with steel pallet or as your requirment
Delivery Detail:within 25days after the deposit or L/C recevied

Specifications

1.scaffolding coupler
2. Brand Name: ADTO
3.Brand: ADTO
4.Standard: EN74/BS1139

Scaffolding coupler for Construction

1.Standard:  EN74/BS1139

2.Surface:galvanized
3.Material:Q235
4.Dimension:48.3mm
5.Features of scaffolding coupler:

1.Good bearing capacity

2.Durable & stable

3.Easy to assemble & dismantle


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q:The basic form of external scaffolding
Basic structureA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:What's the difference between scaffold and industrial piercing?
I agree with A Silent Reminder - They're the same thing, just called something different in different places. I find that people in the U.S call it an Industrial, and those in England call it a Scaffold.
Q:Please help me in building professional people (scaffolding)
Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range