Scaffolding German Type Swivel Clamp

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Jiangsu China (Mainland)
Brand Name:
sc
Model Number:
erman Type Forged Swivel Coupler
Type:
scaffolding coupler
Material:
Q235/225/345
Surface:
Paint,Galvanized,HDG
Color:
silver,yellow,black or as your request
Size:
48.3mm
Weight:
1.3kg
Technics:
Forged
Standard:
EN74, BS1139
scaffolding coupler:
erman Type Forged Swivel Coupler
Stable:
durable

Packaging & Delivery

Packaging Detail:in bulk or pallet according to customer's requirement
Delivery Detail:no more than 20days

Scaffolding coupler

1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank

Specification

German style drop forged swivel couper

1.size:48.3mm

2.weight:1.3kg

3.Material: Q235/225/345

4.surface :self-color / zinc plate / electro galvanized / HDG or painted

5.Standard: EN74 ,BS1139

6.Anti-rust ,skidproof ,high breaking strength

7.Durable finish, reliability, low maintenance, corrosion resistance, robust construction and high tensile strength

8. OEM serice is available


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Calculation of bearing capacity of foundation:The average pressure of the bottom of the vertical rod foundation should meet the requirements of the formulaP = FGDesign value of foundation bearing capacity:FG = fgk x Kc = 200 kN/m2;
Q:How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q:How old do u have to be to get a Scaffolding piesrcing ?
I have one and im 12. Im from Tennessee.
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Q:Specific specification for erection of civil scaffold
Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:How many meters per square meter and the number of steel fasteners
Each of the joints is about 5%, which needs to be controlled by the step distance and the vertical rod spacing. Under the construction of the construction of steel tubular scaffold safety technology
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:Should I get a Scaffold piercing and hide it from my parents?
im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!
Q:How soon can you change a scaffolding piercing?
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
Q:Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range