1.Structure of Saffolding Parts Ringlock Rosette

Scaffolding Parts Ringlock Rosette is for Ringlcok Scaffolding. Normally,material is Q235,can be different surface treatment.


Packaging & Delivery

Packaging   Details:

Wooden   case,or as your request

Delivery   Detail:

15-30   days

2.Saffolding Parts Ringlock Rosette product pictures:

   Saffolding Parts Ringlock Rosette with Galvanized

3. Saffolding Parts Ringlock Rosette Specification:

Material could be Q235/Q255/Q345

1) Surface: Hot dip galvanized,Paint,Galvanizing

2)Weight: 0.43~0.5KG
3) Samples are available

4.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1)How is the Packaging Details?

In bags or as the requirement of customers.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is my scaffold peircing ok? x?
If it gets worse you should swear loudly at yourself for being so stupid.
Q:How long is the service life of disc scaffolding?
Currently on the market there are many scaffolding accessories have been extended service
Q:What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q:How to make a slide using scaffolding?
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
Q:How old do u have to be to get a Scaffolding piesrcing ?
I have one and im 12. Im from Tennessee.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range