Ringlock Ledger End Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q:I need to rent a scaffle that is motorized so I can reach up to 16 ft
- your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
- Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q:What is the significance of the three scaffold scenes in the Scarlet Letter?
- Scaffold Scarlet Letter
- Q:Can a guardrail on a scaffold be used as an access point?
- No NEVER! It is a breach of Health and Safety regulations.
- Q:How much is the price of the bowl buckle scaffold
- The price of the bowl buckle scaffold is 3850 yuan / ton, the cross bar is 1.2 meters, and the price is 3700 yuan per ton, which is about 0.9 yuan,
- Q:How much is a bowl buckle scaffold
- 60*60 about 12 yuan, 60*90 of about $18, but also to see how high, there is no encryption area, as well as materials in and out of it, and so on, you can ask me?
- Q:Weight of bowl buckle scaffold
- Rod name specification A (mm) B (mm) theoretical weight (kg) cross bar HG-30 3001.67 HG-60 6002.90 HG-90 9004.17 HG-120 12005.12 HG-150 15006.28
- Q:How much is the erection height of double row scaffold
- Single row fastener type steel pipe scaffold erection height requirements is 25 meters, double row height doubled, is 50 meters.The single row of cuplok scaffolding height requirements on top, is 30 meters. The same double bowl buckle scaffold is doubled 60 meters.
- Q:What are the main types of bowl buckle scaffold
- Scaffolding is a style of scaffold. This scaffold than often see the fastener scaffold much better. The first is to build much faster. Once again, small accessories will not fall. (fastener will often off the little parts).
- Q:im quite high up so would have to do the job internally (from the inside..avoiding climbing on roof). it seems that a material (looks like cement?) was used on this old roof (on the inside) and some of this has washed away as i can see daylight where the rain water is leaking through. there's also no black felt evident
- You cannot repair any roof from the inside. Whoever did that internal patch was a hack.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ringlock Ledger End Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords