Ringlock Q235/345 Steel Galvanized Product

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
10000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ringlock Scaffolding 


Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.

Ringlock Q235/345 Steel Galvanized Product

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes


Product Show

Ringlock Q235/345 Steel Galvanized Product

The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.


 

Ringlock Q235/345 Steel Galvanized Product

Ringlock Q235/345 Steel Galvanized Product

Ringlock Q235/345 Steel Galvanized Product

Specification of Ringlock Scaffolding



 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Hollow Head Jack And Jack Base

Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment

600

38

150*120*50*4

HDG

600

38

150*150*4

HDG

Ringlock Q235/345 Steel Galvanized Product

Ringlock Q235/345 Steel Galvanized Product












Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Should the WWE bring in New Jack to work scaffold matches with John Cena & Randy Orton?
WWE has no experience in doing scaffold matches. WWE has no interest in hiring New Jack. WWE has no interest in having John Cena and Randy Orton injured and out for months. WWE has already been without The Big Show, Kane, Michelle McCool, The Undertaker, Layla El and Golddust because of injuries. Scaffold Matches were interesting in The NWA in 1986 and 1987, they haven't been interesting for me since then. New Jack, John Cena and Randy Orton are not The Road Warriors, The Rock n' Roll Express or The Midnight Express.
Q:A worker on a scaffolding 85ft above the ground needs to lift a 440lb bucket of cement from the ground to?
Integral 0 to 85 [440 +(85-x)]x dx
Q:How to allow the height of the bowl - shaped steel tube scaffold
2) high efficiency: the longest used rod is 3130mm, weight 17.07kg. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation. 3 (general): the main components are the use of ordinary steel pipe scaffold fastener, the fastener can be connected with the ordinary steel pipe, universal.4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:i walk almost all day long carrying heavy material and climb up and down scaffolding. is this a workout?
Depends what you are trying to achieve. Yes it can be a workout as it gets the blood flowing and the heart pumping, but look at what areas are you trying to target
Q:What are the requirements for the erection of the bowl - shaped steel tube scaffold
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm;
Q:Wheel buckle scaffolding and scaffolding, do.
Whether the hole on the vertical rod is a new steel plate. Some poor businesses use scrap steel plate stamping, uneven force, very easy to damage. 3 the plug on the horizontal bar is cast steel. The cast steel is more tough than the cast iron, the strength is large, and it is not easy to damage. 4 whether the surface treatment is electrophoretic paint. Ordinary spray paint anti-corrosion time is limited, easy to fall off in the process of use...
Q:15 and considering scaffolding (details in description)?
Surely it's logical to ask your uncle for advice
Q:Scaffolding tube – How strong with a straight coupling?
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q:Bowl buckle type steel pipe scaffold and fastener type scaffolding comparison, which is good stability
Check the overall stability of the bowl - shaped steel pipe scaffolding, the current test is not enough (still in progress)
Q:at what age can you get a scaffold/industrial piercing in england without parental consent?
there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range