• Ringlock scaffolding 1 System 1
  • Ringlock scaffolding 1 System 2
  • Ringlock scaffolding 1 System 3
  • Ringlock scaffolding 1 System 4
Ringlock scaffolding 1

Ringlock scaffolding 1

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
3000t kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock scaffolding


      It has two big main points systemφ60 andφ48. Which is Consists of Vertical W/O Spigot,vertical ,horizontal,diagonal,U-head jack,basic socket, Jack Base etc.

      We have the professional team of experienced design engineering to make perfect design for you.

         

Specifications:

 It has two big main points systemφ60 andφ48. Which is Consists of Vertical W/O Spigot,vertical ,horizontal,diagonal,U-head jack,basic socket, Jack Base etc.


Characteristics & Applications :


1.Bearing capacity is big and long service life, up to 20 years.

2.High material utilization, safe and reliable.

3.Flexible use and it is very  fast to set up.

4.Not easy to lost (consumption).

5.Transportation is convenient, easy to manage.

6.It is beautiful and clean.


Market:


The products are exported to all countries around the world,such as The United States, South Korea, Malaysia, India, England, Cambodia, Australia.







Q:Can the horizontal bar of the bowl buckle scaffold be oblique, the vertical position of the vertical bar is a parallelogram, not square
However, the strength may not be enough, depending on the specific parameters.
Q:i work in construction.
Yes!
Q:What is the meaning of WDJ in the WDJ bowl buckle scaffold
Stable frame.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents
Q:Why is there so much unnecessary scaffolding in NYC?
Must belong to someone's cousin. Buildings need cleaning too.
Q:A 56.0kg painter is on a uniform 23.5kg scaffold supported from above by ropes . There is a 5.0kg pail of paint to one side, as shown. How close to the end can he approach safely?
lacking information. How lots stress can each and each rope sustain, how lots tilt will the scaffolding undergo by using circulate. you desire to be lacking some information, that question is unanswerable too many variables.
Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
First of all, I correct it, the length of the bowl buckle frame length of 60CM, that is, 60, 120,, 240CM, but not the length of the 90cm; the length of the horizontal bar of 30cm modulus, namely, 30, 60, 90, 120, 180cm.
Q:Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
The OSHA manual says that each job should have a compentant person this is someone who observes all saftey issues on the job. If you do not have one then it shouldd be the contractor that put the scaffolding up should be the one to make sure everything is correct
Q:how can you tell is a scaffolding piercing is infected?
Excessive redness extending well beyond the piercing area, hot to the touch, yellow/green pus with an odor.
Q:My current bar, my first ever bar, is about 43mm long, but it has a large gap from my ear to the balls, either side (1/2 cm each side)What length(mm) bar should I get now?
There is no way to know, everyone's ear is a different size so length of the bar is going to vary from person to person. Go to another piercer to have them fit jewelry to you.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords