Light Duty of Hex nut for Scaffolding and Formwork System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Hex Nut Description 

Light duty of hex nut is a important accessories of scaffolding system. The advantages as below.


2.Main Features of Hex Nut

 It will greatly reduce the cost because of the following advantages

1)Extremely tight

2)Easy to install

3)It can be used again and again for nearly 20years

 

3. Light Duty of Hex Nut product pictures:

   Light Duty of Hex nut for Scaffolding and Formwork System


 4.Light Duty of Hex Nut Product Description

1) Material :  Ductile Casted Iron QT450-10

 

2) Surface treatment:  plain, electrogalvanized

 

3) Color:  Plain,galvanized 

 

4) Weight:  0.1-0.57kg

 

5) Height: 26/31/36/50/57/60/100/120mm  or customized

 

6) Inside Diameter : 15/20mm or customized

 

7) Length of side : 27/30/46mm or customized


8)Matched Screw : 17mm screw


 5.FAQ 

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:Fastener type steel pipe scaffold composed of which components?
3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
Q:How many meters per square meter and the number of steel fasteners
Each of the joints is about 5%, which needs to be controlled by the step distance and the vertical rod spacing. Under the construction of the construction of steel tubular scaffold safety technology
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:I need to be guided to supplier of Aluminum Scaffolding?
Please okorder.com Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:Fastener type steel pipe scaffold accessories
Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range