​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.2*2000 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Steel Plank  Metal Planks 225*38*1.2*2000

  • Material :Q195 (Carbon 195 Steel)

  • Size :225*438*1.2*2000mm(or customized)

  • Surface treatment :galvanized

  • Color : silver

  • ​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.2*2000 CNBM

  • ​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.2*2000 CNBM

  • Hot Dip Galvanized Steel Plank  Metal Planks 225*38*1.2*2000

  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.

  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity


  • What are the advantages of  your products?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:Scaffold Piercing Im 15 Help.?
the one you have needs to line up with the one you want, know what i mean. i imagine that most single cartilage piercings are not pointing the right direction to accommodate scaffolding.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q:Is my scaffold piercing infected?
it sounds like it's just irritated, if it's infected it will be secreting puss. Have you tried to soak it in the rock salt solution? Soak two cotton balls and put one on each side on the piercing and keep it there for 10 minutes a day. And make sure the antiseptic spray has zero alcohol in it because that can irritate it and prolong healing. Try this for a few days and if it's not getting better then go see your doctor.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:Which kind of scaffolding is the most convenient and time-saving?
The advantages of the new scaffold (compared with the bowl button) are as follows:1, with sufficient mechanical strength, stiffness and stability, safe and reliable work.2, the node connection without frame degree, has the ability to self lock, installation and disassembly flexible and quick, easy to grasp, support, removal efficiency than the bowl buckle type multifunctional scaffolding about three times, can save labor, labor, save time. In the process of construction, opening and closing channels at any time.
Q:Specification and type of scaffold erection
4 the vertical pole of the scaffold, the size of the cross bar according to the specific use of the scaffold to determine the specific circumstances, but shall not exceed the following values:Horizontal vertical rod vertical rod large cross bar small crossbar small cantilever cantilever length 1.5m 1.2m 2.0m 1.5m 0.45M5 ramps board, springboard slope is no larger than 1:3, width of not less than 1.5m. 6 wooden rods: wire with 8#

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range