high strength ringlock scaffold ledger end

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Type:
Scaffolding ringlock ledger heads/end
Item:
Scaffolding ringlock ledger heads/end
Material:
Q235/Q255
Surface Treatment:
HDG,electro galvanized
standard:
ISO9001:2000 approved
dia size:
48.3*3.25mm
ISO9001:2000:
Approved
OEM service:
available

Packaging & Delivery

Packaging Detail:scaffold ledger heads:Steel pallet/plywood pallet or customerized
Delivery Detail:scaffold ledger heads :25-40 days as your quantity

Specifications

Scaffolding ringlock ledger heads/end
Material:Q235/Q255
Surface treatment:HDG
size :48.3X3.25mm
Reliable quanlity

Scaffolding ringlock ledger heads/end    

Product Description

1.Name:          Scaffolding ringlock ledger heads/end

2.Material:Q235,Q255,Q345

3.Surface treament:hot-dip galvanized.dip-painting,electroplate galvanized, power coating

4.Size:customized

5.Service: OEM is available

6.Standards:ISO9001:2008 approved

Our Main Manufacturing:

(1)   Scaffolding System:Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps:We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(4)   Formwork System Scaffolding & Accessories:Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:New features of quick dismantling scaffolding?
Preservative treatment: Advanced electrophoresis paint treatment, both inside and outside the paintCorrosion effect is longer than the traditional painting and painting steel tube life of 5-8 years
Q:Specification for construction steel pipe scaffolding and construction safety rules?
2, operating conditionsAccording to the engineering characteristics and construction requirements of the scaffolding erection scheme.The shelf position has to clean up the site.On the soft soil foundation has been hardening.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
PoleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004LG-120 12007.41LG-180 180010.67LG-240 240014.02LG-300 300017.31
Q:What's the difference between scaffold and industrial piercing?
Theres no difference scaffold is what they call it in like europe, indusstrial is usa
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
The quality standard of the foot hand frame fittings: 1, steel pipe: (1) the steel pipe adopts the outside diameter is 48mm, the wall thickness is 3.5mm, the quality standard of the foot hand frame fittings
Q:Scaffold Piercing Aftercare?
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:How old do you have to be to get a scaffold piercing in washington?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range