• Heavy Duty Cuplock Scaffold for Construction System 1
  • Heavy Duty Cuplock Scaffold for Construction System 2
  • Heavy Duty Cuplock Scaffold for Construction System 3
Heavy Duty Cuplock Scaffold for Construction

Heavy Duty Cuplock Scaffold for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

BRAND:
CMAX


1. Main Features of CMAX Heavy Duty Cuplock Scaffold System

- the cup-lock scaffolding is more safe and reliable;

- convenient ,redundant utilization ration higher merit. 

- low pressure fluid high strength welded pipe, welds through the carbon dioxide protection according to the specific shape welding. 

- suitable specially for high-rise construction project constructions and so on the construction inside and outside scaffold, bridge, multi-level crossing bridge, tunnel, subway, also may take the mechanical and electrical installment, the paint whitewash, the equipment service, the advertisement manufacture activity working platform.

 

2. CMAXHeavy Duty Cuplock Scaffold System Project View

Heavy Duty Cuplock Scaffold for Construction

Heavy Duty Cuplock Scaffold for Construction

 

Heavy Duty Cuplock Scaffold for Construction

 

4. FAQ of  CMAX Heavy Duty Cuplock Scaffold System

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

 

Q:A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
Q:I got my scaffold pierced last thursday (it is now monday) and it hurts soooo much! i cant even lean it properly, its not infected its just because when i knock one part of it the whole thing hurts, and my hair keeps getting knotted around it etc, can someone tell me who has had experience with this piercing when it will heal?
my friend has it and shes had problems with it like you do with the hair and stuff but hers healed up in about 4 months. and its so cute. if i was aloud to get one i would so get it
Q:Can any one tell me about different types of scaffolding? Especially about tubular and frame scaffolding. If you can tell me about the components using in scaffolding also, that would be appreciate. Please give me some useful links too. Thanks in advance.Regards,Just A Guy
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q:What are the advantages of rental scaffolding
Fine design geometry and improve steel turnover material consumption from economic effect fastening steel frame equivalent per square meter construction steel consumption of about 15 kg (1) special screw fastener defects) easily lost; 2) node rod connected by partial sliding resistance load transfer in force to reduce its carrying capacity; 3 the fastener fastener connection quality) by itself quality significantly affected the operation adaptability of 1) to build various forms of scaffolding, the template support frame;
Q:Bowl buckle scaffold is the whole force or local force
Therefore, it has no bearing capacity and stability of the scaffolding
Q:the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q:What are the specifications of the bowl fastener? What kind of
Bowl buckle bracket. Divided into horizontal and vertical rod
Q:i had an industrial piercing 2 days ago and was just wondering roughly how long untill i can change the bar? ive seen a few i like and want to change the boring one asap,..also, do u think my ears look crowded??? i dont have any pictures but on my left ear i have earlobe, tragus and rook, and my right ear i have ear lobe, anti-tragus and industrial..just wondering what u think.. thankss x
Well it doesn't really matter what anyone else thinks as long as you like them, you are the one that has to live with them. and i would recommend leaving for about 4-6 weeks depending on how well and quick you heel as everybody heels different. ring the place were you had it done and they will be able to advise you more on it. Hope this helped
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
1200 or 900 spacing is generally adopted in practice. According to the size of the room are on the line. Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches