Heavy Duty Cuplock Scaffold for Construction

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

BRAND: CMAX

Product Description:


1. Main Features of CMAX Heavy Duty Cuplock Scaffold System

- the cup-lock scaffolding is more safe and reliable;

- convenient ,redundant utilization ration higher merit. 

- low pressure fluid high strength welded pipe, welds through the carbon dioxide protection according to the specific shape welding. 

- suitable specially for high-rise construction project constructions and so on the construction inside and outside scaffold, bridge, multi-level crossing bridge, tunnel, subway, also may take the mechanical and electrical installment, the paint whitewash, the equipment service, the advertisement manufacture activity working platform.

 

2. CMAXHeavy Duty Cuplock Scaffold System Project View

Heavy Duty Cuplock Scaffold for Construction

Heavy Duty Cuplock Scaffold for Construction

 

Heavy Duty Cuplock Scaffold for Construction

 

4. FAQ of  CMAX Heavy Duty Cuplock Scaffold System

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can I remove scaffolding off my property?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
The steel pipe scaffold is composed of a fastener and a frame tube, each of which is connected by a fastener
Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
Technical code for safety of steel tubular scaffold with couplers in JGJ130-2011 constructionJGJ128-2010 technical code for safety of steel tubular scaffold for building constructionTechnical code for safety of JGJ202-2010 construction scaffolding
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
It seems that there is no specific load value in the code, but there are some requirements on the calculation method and some structural loads
Q:Scaffolding level net height, spacing
First, the "construction safety inspection standards" JGJ59-2011 part of the extract:3.3 fastener type steel pipe scaffold3.3.4 inspection and evaluation of general projects shall comply with the following requirements:
Q:Danse Macabre, and March to the Scaffold. Are they similar? What musical elements are included?
they are both similar as the both revolve around death
Q:Calculation method of various kinds of fasteners and fastening screws for engineering scaffold steel pipe
For the convenience of calculation, the working group can according to the corresponding standard scaffolding scaffolding load, the statistics range and ETA lambda value, compiles "m table for the reader to use
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:does scaffolding uses truss or frame?
problematic point. research onto yahoo and bing. that will will help!
Q:How long does it take to put up scaffolding?
all depends how many guys are putting up the scaffold but I would say more than two hours

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range