FUXIANG Tower Crane TC6014A (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
A few days ago, a special training course of mechanical equipment, a safety supervision station old experts say the screw from the upward wear, stress is the same, but if the nut screw will fall off, in order to find problems. If you can't get it off the top and bottom nut, you won't find it
Q:What are the conditions of tower cranes, strictly prohibited?
A. Products obsolete by the stateB, over the specified service life, failed to assess the quality of the productC, products that do not conform to national or trade standardsD, products without complete security technical records
Q:What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q:How to build a tower crane?
4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(1) the lift height limit position limiter must be able to stop lifting motion immediately when the lifting device is raised to the 8OOmm at the lower end of the boom. For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately. (2) lifting moment limiter and maximum weight limiter; when lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped. If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value. When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q:What does "jack up" tower crane 1000KNm mean?
1000KNm means that the rated lifting moment of the tower crane is 1000KNm. That is to say, the 100tm tower crane.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
Is the site of the tower crane is not, the crane company specializes in the construction site is rented, the price range depends on the length of your period, due to demolition of the problem, I am not a professional, but I am working at the site, only know so much

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range