FUXIANG Tower Crane TC5010C (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:are crane flies the most venomous insect in the world,or is this just an urban myth?
Chuck Norris is the most lethal of all!!!!!!!!!!!!!!!!
Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:what do people do with sandhill cranes after shooting them?
This Site Might Help You. RE: what do people do with sandhill cranes after shooting them? do they eat them or what? i hear about hunting them and i think cool but what do you do with them i mean do they tast good?
Q:How do you jump a crane? I know you jack it up but how is that done?
I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?
Q:I looking for information on the surname Crane.?
There okorder.com
Q:why are tower cranes positioned the way they are when they are shut down for the day?
I can think of a few reasons. The first 2 are safety related, the 3rd is work-efficiency related. 1. To minimize wind loading for the expected wind-direction overnight. 2. To minimize damage to the surrounding area should a failure happen and a crane fall (similar to felling a tree in a forest so it falls in the direction the lumberjack wants it to fall). 3. To leave the boom over the worksite for the next morning's first pickup (so, it would be a coincidence that all the pickup sites were at the same angle relative to the booms). .
Q:why do cranes have outriggers?
the capacity of a travelling crane relates to its resistance to tipping, and is dependent upon wheelbase, which can be extended by use of the outriggers, and counterweight (the big boxy thing at the back of the crane). Every lift requires a firm and stable platform which is what the outriggers provide. For every lift (weight) and reach (how far from the slew point), there is a limiting capacity factor. This is required to be posted within the operator's cab. The actual load lifted may be monitored by a load cell on a running rope (or other location), and through a computer control, limit the actual capacity of the crane.
Q:what does 1000 origami cranes mean?
I don't get it. Who's going to grant you a wish? The magic crane genie? Buddha? Why not try praying to God who might be able to help you, without going to all of the work and giving yourself paper cuts.
Q:How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
IT IS BUILT UP SECTION BY SECTION AND THEN TAKE IT DOWN THE SAME WAY.
Q:what is crane rigging?
Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range