FANGYUAN TOWER CRANE TC5512

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane body standard section connection bolt screw upward or downward, why?.
A few days ago, a special training course of mechanical equipment, a safety supervision station old experts say the screw from the upward wear, stress is the same, but if the nut screw will fall off, in order to find problems. If you can't get it off the top and bottom nut, you won't find it
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
It's the same kind of tower crane, but it's only a unit of rated lifting torque. The former unit is 63 tons. M, the latter is 630 kn m. According to the latest national standard "tower crane", GB/T5031-2008 and QTZ63 are written correctly.
Q:What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:What measures should be taken to make tower cranes stable?
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:What role does the tower crane torque limiter play?
The torque limiter has two kinds of electronic type and mechanical type, electronic type: can show the torque, radius and load, near the tower crane permit torque, there will be a warning signal, although easy to use, the working conditions of cutting has been greatly affected, but not very reliable, easy to damage, the maintenance of trouble. Mechanical type: Although there is no display and can not alarm, but the work of the letter, the structure is simple, not easy to damage, suitable for construction site conditions.
Q:Minimum QTZ63 tower crane special electric box open for many A
Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:What is the free height of a tower crane?
The free height of tower crane is different according to the size of tower crane.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
This really did not hear, the site installed to be tested, usually installed, in accordance with the safety procedures, acceptance of the OK
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range