FANGYUAN Electric Crawler Pile Driver ZSW90

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

JZL Long Spiral Electric Crawler Pile Driver

The JZL and JZB series of pile frame developed by Fangyuan Group are mainly used in the construction of pile foundation with various operation methods, such as long spiral drilling, diesel piling hammer, SMW technology, and etc. With safe and beautiful structure, reliable and advanced control, and flexible operation, the product is very popular among customers.

Electric Crawler Pile Driver    

JZL series of electric crawler pile frame developed by Fangyuan Group has independent intellectual property right, and it features complete electric control, high efficiency, good stability, high performance/price ratio, etc. Equipped with different working devices, the product can be used as different piling machinery such as long spiral drill, SMW machine, screw pile machine, and diesel hammer pile driver, which is real multifunctional and it can eliminate the needs for some of the imported equipment, which greatly reduces the cost.

Model

JZL60

JZL90

JZL120

JZW90

Main Functions

Long Spiral

Long Spiral

Long Spiral

Screw Pile

Max.boring diameter

mm

800

800

1000

500

Max.boring depth

m

25

31

3133

24

Column height

m

30.5

36.5

36.838.8

30.5

Lifting capacity

kN

400

640

800

420

Lifting speed

m/min

2.0/2.6/3.2

1.8/2.2/2.6

1.2/1.6/2.0

1.8/2.1/2.4

Slewing speed

r/min

0.37

0.36

0.38

0.36

Travel speed

km/h

0.25

0.28

0.28

0.28

Total weight

t

58

70

90

75

Dimension

Length

m

12

13.6

13.4

13.6

Width

m

5.5

6

6.2

6

Height

m

32.6

38.5

38.8

32.5


The above parameters are subject to change without prior notice, please refer to the actual product.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many prestressed concrete pipe piles can a pile driver hit in a day?
You can hit 4 roots a day.Precast pile, various materials, various forms made in the factory or the construction site of the pile (such as wood, concrete pile, prestressed concrete pipe pile, steel, etc.) with piling equipment will be pressed into piles, or buried in vibration. More prefabricated piles are used in the field of building construction in China, mainly concrete precast piles and steel piles in two major categories.Precast piles are mainly concrete precast pile and steel pile two major categories. Precast concrete pile can bear larger load, durable, fast construction speed, is one of the most widely used type of pile, but its construction has great influence on the surrounding environment, are the most commonly used concrete solid pile and prestressed concrete hollow pile. Steel pile is mainly steel pipe pile and H steel pile two kinds.
Q:Is there an operation certificate for percussive drill driver?
at the top of the main frame is fixedly connected with the pulley first, the lower part is provided with a steering pulley, the pulley head and a steering pulley connected by wire rope transmission; one end of the wire rope is fixedly connected with the hammer, the other end is connected to a winch Part; the manipulation of PLC electric control box, automatic operation mechanism began to work, you can control the opening and closing part of piling winch clutch, the automatic impact drill piling machine has the advantages of simple structure, low cost, convenient operation, reliable performance.
Q:Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q:What's the model of a portable anti flood pile driver? What is the depth of the pile?
Shape size * height * width 450*350*450mm3) work parameters:Operation object: River, Hutang embankment (homogeneous soil)Pile diameter: 60 - 120mmLength: less than or equal to 3000mmPile driving speed: 500-1000mm/minIf you don't know, you can ask me again
Q:AMD FX 8350 eight core CPU AM3+ piling machine and tin box what is the difference between the master pointing
FX-8350 I bought it for my friend. It's got a Aeolus ice edge 400 radiator. Not very expensive, more than 140 yuan. Standby is OK. If you run the program, it's a little bit overwhelming. I suggest you get a radiator for about 400 yuan. Recommended by Aeolus.
Q:What certificate should be required for the construction of the pile driver?
After the site installation of pile driving machine is completed, the testing institution shall be qualified for on-site inspection and issued a certificate of qualification.
Q:Want to learn this kind of pile driver?.
Excavator forklift forklift, good work
Q:What is the noise level of site construction (piling)?
The structure of phase, daytime noise limit is 70 dB, the night noise limit is 55 dBThe decoration stage, daytime noise limit is 65 dB, the night noise limit is 55 dBThe daytime generally refers to 7:00 in the morning to 23:00 at night, the night usually 23:00 to 7 o'clock in the morning.
Q:How many small pile drivers are there in Hunan? It's best to have the exact location
Hunan small piling machine manufacturers or a lot, like Hunan wylong machinery should be more excellent in mechanical industry.
Q:Why should the pile foundation be excavated after the pile driving?
It is convenient to measure and locate the center of the pile, and also facilitate the approach of the piling machine

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range