DAHA Tower Crane QTZ6013

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
60 /month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Dahan group, established in 2000, is specialized in Tower Crane Hoist and Building Hoist. And registered capital reaches 100 million RMB. Dahan group has their own research and development department as well as production, marketing, service and financial department. The production capacity can be over 10000 sets and have earned the reputation as a leading manufacturer of tower crane and construction hoist.

Located in Jinan high and new technology industrial zone, office area is 3000square meters. Production base is in Jinan, Guangdong, Hunan. Total area  reaches 300000 square meters.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our Dahan concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Dahan people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Dahan to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Dahan people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does a track type tower crane look like? In that case, use?
The rail type multi characteristic tower crane consists of track, door frame, main arm, auxiliary arm, hook and so on. Its features are: A, crane through the door frame (2), supported on a track (1); B, the door frame (2) is provided with a rotary bearing (3); C (3) is arranged on the rotary supporting all kinds of machinery and equipment (4), and balance weight (8); D, the main arm (5) the jib (6) through the bearing cable (7) is installed on the rotary support (3); E, the main arm (5) side arm (6) and Russo (7) can have a variety of length combination; F, a main arm, jib all tube truss structure; G, hook pulley h, equipped with a variety of rate; the torque limiter (10) and amplitude detection device (11); I, operating room in slewing bearing (3); J, self moving use winch is luffing winch main arm, mounted on a rotary support (3).Track type multi characteristic tower crane. The utility model is especially suitable for power construction and hoisting operation. The slewing support on the track type door frame is provided with a main and an auxiliary arm frame, and various variants can be formed through different combinations. Its maximum torque of 3360 tons meters, the maximum lifting capacity of 140 tons, the maximum working range of 60 meters, the maximum rise of 120 meters. The utility model can be carried in the lifting, and the work is smooth and safe. The main and auxiliary arms are all truss structures, light in weight. The electronic torque limiter and other safety devices are adopted, and the 130 meter high machine can be installed by itself. This machine can also be used in petroleum, chemical, metallurgical and other large projects.
Q:In dragon ball, Why is master crane evil in the filler?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q:White Crane Karate?
Same thing. White Crane in Japan is Karate. In China Kung Fu. Some variation in style though not a lot. One of the 5 animal styles.
Q:Do US Navy Boatswains Mates Operate Cranes?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www.public.navy.mil/bupers-npc/re...
Q:How did the tower crane rise on the construction site? Fifteen
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:Paper cranes... What do I do?
Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
Q:Can anybody explain how they assemble a tower crane. How long does it take? How?
Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
Q:I need help getting back to crane in maplestory?
I don't really understand what you're saying, but I'll try to help. You can only enter the crane every few minutes or so (I'm not sure of the exact time). When the crane is closed, there will be a gray door barring the way. When it is open, it will have a greenish-yellowish open doorway. You have to wait for it to arrive and open.
Q:how can we make a troubleshooting for tower crane control panel?
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q:tell need to know about sandhill cranes?
I'm from the Sandhills of Nebraska and that is where some of them come from.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range