Cuplock System Scaffolding MOQ 1 Ton/Tons

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cuplock System Scaffolding  MOQ 1 Ton/Tons


Product:

For standards at the begining and end of a row, the loading figures for the top and base lifts have to be reduced by 5%, except if jack bracing is used.
This also applies to the use of K-Lock in towers and single bays. t least two lacing levels have to be used on each standard. When calculating horizontal forces, include wind forces, the effect of eccentricity, and out of plump (in accordance with British Standard 5975).


Take care that the structure is stable in the unloaded condition, especially if towers or narrow structures are used.
All standards should be erected plumb. Horizontal forces should be distributed over all standards as evenly as
possible. Sound footings should be provided to prevent settlement of the standards. 

Cuplock System Scaffolding  MOQ 1 Ton/Tons

Cuplock System Scaffolding  MOQ 1 Ton/Tons

Advantage:

 Factroy-low cost+reasonable, negotiable price

 OEM service avalable

 Durable and stable+high quality

 SGS,ISO9001:2000,BS1139 Certificate


Detailed information


Commodity name

hot dip galvanized cuplock scaffolding system 

 

Usage

Fixed Scaffold Pipe

Origin

China Mainland

Material

45#

Size 

48.3mm 

Weight 

0.50kg 

Process

forged 

Surface

Electro-galvanized,zinc plate 

M.O.Q

1000PCS

Packing

Woven bags + steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS, ISO9001:2000

Advantage

1.High quality  2.Professional service  3.Competitive price

Notes

Special marks can be made according to customers requirements


It is available to produce by customer drawing

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:scaffold, where to buy?
northern tools . 1800-556-7885
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range