Cuplock System Scaffolding/Cuplock Scaffolding System with Extraordinary Performances

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
4000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Main Features of Cuplock Scaffolding:

 

Comperticative price
Good bearing capacity
Stable& durable
Easy to assemble or dismantle

Light weight

High strength

High standardized system

Components:Standard,Ledger,Diagonal,Top Cup,Bottom Cup,

Ledger Blade

 

2.Specifications of Cuplock Scaffolding:

 

Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain. 

Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.  

Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supportingframe, supporting column, materials lifting frame, stage supporting, etc. 

High loading: The standard actuates axially, this makes the scaffolding in the three-dimensional space, high strength and steady of the structure. The cross plate is good at axial shearing resistant, and makes the axis of each pipe in one plate, so it improves 15% strength and steady performance. 

Re-used: Luowen scaffoldings are made by high grade steel, they are not easy to damage or out of shape,so it could be used repeatedly.

Size:

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8


3.Regular Size of of Cuplock Scaffolding:



Standard

Ø48.3×3.25

Q345

Ledger

Ø48.3×3.25

Q235

Diagonal

Ø48.3×3.25

Q235

Size/mm

Weight/kg

Size/mm

Weight/kg

Size/mm

Weight/kg

500

3.45

600

2.54

1300×2000

9.21

1000

5.58

900

3.60

1800×2000

10.31

1300

7.97

1000

4.10

2500×2000

12.16

1500

8.74

1200

4.70



1800

10.60

1250

5.00



2000

11.38

1300

5.20



2500

14.00

1600

6.30



3000

16.63

1800

7.00





2500

9.54



 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


4.Pictures of Cuplock Scaffolding:



Cuplock System Scaffolding/Cuplock Scaffolding System with Extraordinary Performances



5.FAQ:


What can we do for you? 


We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  


What about the package and shipping time?


Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:

Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Other mass qty of Steel Frame Formwork GK120, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I want an industrial piercing?(Scaffolding)?
It can collapse your cartilage, if you get it done with a gun. If you go to a professional, and they do it with a needle, you'll be fine.
Q:Can I remove scaffolding off my property?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:How can i fing scaffolding turnarounds online?
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q:What are the advantages of rental scaffolding
2) assembly derrick; 3) the erection of ramps, sheds, and temporary structures stand 4) as the scaffold auxiliary reinforcing bar; erection requirements of steel fastener scaffolding should pay attention to the formation of a solid base plate and the base set by drainage measures to prevent water immersion on wall connecting rod set and load with the open type double scaffolding pole horizontal distance 1.05~1.55m masonry scaffolding step is like 1.20~1.35m or decorative masonry, decorative dual-purpose scaffolding like 1.80m pole vertical distance 1.2~2.0m which allows erection height of 34~50m single row set the pole horizontal distance 1.2~1.4 m pole vertical distance 1.5~2.0m allows erection height 24m longitudinal horizontal bar should be set inside the pole the degree for 3 span longitudinal rod with fastener fastener is connected with the lap fasteners should be staggered
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
The scaffold is common in interior formwork support, generally in the plane projection matrix, identified in the upper load situation, through the relevant calculations to determine the vertical and horizontal spacing, vertical rod erection step rails to ensure the bearing capacity of the frame body.
Q:Hi i am 13 and going into 8th grade. i want to get a industrail piercing (scaffold)?
No don't do that.. That is a really masculine piercing. I've hurt it hurts pretty bad to. Get one cartilage or a tragus. Much more feminime and very cute.
Q:What's the story in March to the Scaffold?
This Site Might Help You. RE: What's the story in March to the Scaffold? All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
Q:Does it hurt when you get a scaffold piercing?
sure i could deliver it a five out of 10. good valued at it! For american citizens that do not recognise.... she is speaking approximately an business piercing it is known as a scaffold piercing within the UK.
Q:Where can I get my scaffold pierced in Glasgow?
Nirvana, in Chisholm St i would never go anywhere else i got all mine there and both my teen daughters got theirs there as well first class, perfect hygiene, VERY experienced and lovely staff john christine, especially
Q:Disc scaffolding used in the country?
I do bowl buckle scaffolding, the current use of more bowl buckle scaffold, disc scaffolding cross-border, if there is an accident

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range