cup lock scaffolding for sale

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

SGS certificate:
available
clients on-site inspection:
available
samples:
available for free
sample freight charge:
payable at the buyer's side
raw materials text report:
available
Mill test report:
available

Packaging & Delivery

Packaging Detail:by pallet suitable for sea transport.
Delivery Detail:within 25-35days after deposit received

Specifications

cuplock scaffold
1. High reliability
2. Low wastager
3. set up flexible,high efficiency
4.fast quote and response

Product Description

cuplock scaffold

Cuplock scaffolding is one of the worlds most widely used scaffolding systems.

Its unique circular node allows up to 4 components to be connected in one fastening action.

Standard material:48.3 x 3.2mm

Steel grade available: Q235, Q345

Surface: Hot Dipped Galvanized, Paint.

Component name

size

Cuplock standard(mm)

500, 1000, 1300, 1500, 1800,2000, 2300,2500,3000

Transom Beam(mm)

565, 795, 1200, 1300, 1800, 2500

Cuplock ledger(mm)

600, 900, 1000, 1200, 1300, 1600, 1800, 2500

Diagonal brace(mm)

1300x2000, 1800x2000, 2500x2000

Bracket

565mm/6.60kg, 7.95mm/7.60kg

Special sizes are also available at the buyers option.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how long untill i can change my scaffolding bar?
U shouldn't exchange it. i've got had undesirable journey with that. If the bar that it replaced into pierced with dosent worsen ur tongue then use the comparable bar and purely exchange the ball. Ur working a hazard changing the bar bc u do not kno if the hot bar will infect or irratate ur tongue. If u do pick to alter it wait apprx 6wks except ur putting yet another a million in as quickly as u take the 1st a million out. U can exchange the ball suitable after u get it pierced bc the ball dosent remember as long as u save the bar in.
Q:Floor type scaffolding construction program is what kind of, what role?
The role and requirements of scaffolding:1, the role of scaffolding:(1) operating platform(2) stacked materials(3) short distance transport
Q:Wheel buckle scaffolding rental price
1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.
Q:A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint t?
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
The welding rod is welded on the transverse rod and the diagonal rod, and the transverse rod and the inclined rod are inserted into the lower bowl buckle when the assembly is assembledA bowl type steel tube scaffold column horizontal distance is 1.2 m, the vertical distance according to the load of scaffold is 1.2 m; 1.5 m; 1.8 m; 2.4 m, step away from 1.8 m and 2.4 M. when erecting pole connecting joints should be staggered, staggered first layer vertical rod 1.8 m long and 3 m the vertical bar,
Q:As Dimmesdale stands beside the scaffold, what does the crowd expect him to do?
e. do his own homework Only joking. It's definitely d. Or c.
Q:Standard Specification for steel tubes for ladder type scaffolding
Galvanized steel pipe should be used DN40, according to the material of the rod is divided into: 1, a single steel pipe scaffolding. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5. 2, a variety of specifications of steel scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3, the steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. Scaffolding bowl buckle type steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using steel cross bar, for the "steel pipe based scaffold".
Q:What kind of scaffolding used in engineering construction
Fastener type steel pipe scaffold for engineering building".
Q:How to ask for a tragus and scaffold peircing?
Congrats on the recent piercing =) nicely, a buddy of mine had hers achieved, and from what i found out while chatting with my piercer (making plans to get mine on Friday!!) Scaffolds take in to a 12 months to heal, and that they do bleed. merely be optimistic to scrub it, and take stable care of it, if its hurting take an ibuprofen as they're anti-inflammatory so as that they are going to take down the swelling and minimise the discomfort some bleed greater beneficial than others Its like discomfort, some locate discomfort greater tolerable than others do each and all the suitable xxx
Q:is there any a well known name for scaffolding?
Affix okorder.com

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range