Cup-lock Scaffolding with Easy Assembling, Well Known Products

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Intriduction of Cup-lock Scaffolding:

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Application: 

    Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

 

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

Cup-lock Scaffolding with Easy Assembling, Well Known Products

 

Cup-lock Scaffolding with Easy Assembling, Well Known Products

4. FAQ of Cup-lock Scaffolding

1) How to guarantee the quality of the products?

We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2) What is packing & delivery term?

Export standerd package or as customer's requirements.

3) Why Choose us?

What promises can be done by us?

If interested in this kind of formwork, please feel free to write us for any QUOTE.

If need any technical and building assistance, we could provide on-site professional staff for instruction.

Please DO check goods when courier knocks your door and contact us asap if any issues.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Single double scaffolding distinctionPlease list the sketch map
Rely on the contact surface friction force transmission, that is, by the contact surface of the node after the compression of the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, by tightening the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
Q:Bowl buckle scaffold can be used to support it
Need to take some special way to do some processing
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
Double row scaffolding as the name implies, is composed of two rows of independent vertical rod through a small bar, a large bar member connected to the temporary bearing frame body, a common fastener tubular steel scaffolding, scaffolding, construction building frame periphery is currently the most common form of.
Q:A brick is dropped from a high scaffold. What is its velocity after 2.9 s?
v = u + at u = 0; a = 9.8m/s2 t = 2.9s v = 0 + 9.8 * 2.9 = 28.42m/s
Q:Bowl buckle scaffold theory weight table who has, the distance is how much?
The main structure of the construction of the use of scaffolding scaffolding most of the scaffolding, the vertical pole of the scaffolding is generally 1.2~1.8m; transverse distance is generally 0.9~1.5m.
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
So you don't fall. The reason you want the inspection to be recent is that people change things when you're not looking. Or, the wind could move something that you're not expecting.
Q:I would like to ask those who know the specification scaffolding? Can you teach me?
First, the role of scaffolding and requirements: 1, the role of scaffolding: (1)operating platform(2)Stacking material(3)Short distance horizontal transportation
Q:Should I get a scaffold piercing or a second piercing on each ear lobe?
They are near impossible to get rid of and may never stop growing.
Q:Is angkor wat still under restoration with scaffolding?
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range