Cup-lock Scaffolding for Formwork Support System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Cup-lock Scaffolding for Formwork Support System

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Cup-lock Scaffolding for Formwork Support System

Equipment of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Avoid using bolt in assembly and low down labor intensity

Reliable bending, shearing, torsional strength of dentition &cup-lock connection, the overall of it is more stable than normal

Not easy to lose fastener, portable firm and easy to maintain and transport 

 

3. Cup-lock Scaffolding Images

 

Cup-lock Scaffolding for Formwork Support System

 

Cup-lock Scaffolding for Formwork Support System

 

4. Cup-lock Scaffolding for Formwork Support System Specification

There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar. 5 times fast of adapter plug assembly and dis-assembly than normal. Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage.

 

5. FAQ of  Cup-lock Scaffolding for Formwork Support System

1) What can we do for you? 

    We can ensure the quality of the Cup-lock Scaffolding for Formwork Support System and avoid extra expenses for customers.    

    We can provide you the professional technical team.    

    We can provide professional building proposal for your project.       

    Please feel free to customize. 

 

2) What promises can be done by us?

    If interested in Cup-lock Scaffolding for Formwork Support System, please feel free to write us for any QUOTE.

    If need any technical and building assistance, we could provide on-site professional staff for instruction.

    Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

    Response will be carried out  in 24hours  after receiving any complain or request.

    Any formwork cost can be refund after order is confirmed. 

    If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    Packing: wood package and adhesive tape

    Shipping: by sea

    Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:As Dimmesdale stands beside the scaffold, what does the crowd expect him to do?
e. do his own homework Only joking. It's definitely d. Or c.
Q:What are the requirements for fastener type scaffolding? How to calculate
3, in order to ensure the safety of the scaffolding construction, scaffold should have enough strength, stiffness and stability.  4, the use of scaffolding must be set along the outer wall of the safety net, to prevent falling material and high altitude operators fall
Q:Scaffolding Tube Strength?
though that page doesn't seem to be quite complete
Q:Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
In general, all scaffolding are used to build a bowl buckle scaffold, and rarely use fastener scaffolding to take,
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:The Scarlet Letter scaffold scenes?
concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 295 N scaffold supported by two cables attached to its?
Where is the figure?
Q:If the guillotine operator walked away from the scaffold where would he be headed?
Rolling down the aisles.
Q:Wheel buckle scaffolding rental price
1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.
Q:¿which tragic dead is better in the scaffold to end my tragic story of the forbbiden lovers?
Yeah I am big into tragic romances especially during that era. I also vote for burning at the stake. I mean just the concept of fire consuming them as passion did invokes such empathy and sadness. Also since it is not a quick execution think of what you can do to prolong the execution. They will be able to hear each others agony and they can say their i love yous as their dying words. Romantic, tragic, it would rock!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range