Cup Lock Scaffolding by Painting from China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

 1.Structure of cup lock Description

Cup-lock Scaffolding consists of adapter plug of cup-lock post, cross bar, diagonal brace, top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post, ledger connections and limit pins of top cups.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock Scaffolding by Painting  from China

 4.Cup lock Product Description

 Cup Lock Scaffolding by Painting  from China

 5.FAQ

We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:Please help me in building professional people (scaffolding)
Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q:Method for inspection of foot hand frame fittings
Should adopt the current national standard "straight welded steel pipe" GBT 13793
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
i wouldn't. it may look rly cool now, but wait til u get older. would a job interview go well with that piercing? or a big hole? just think about that.
Q:1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q:Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request