• Construction Hoist Building Lifter SC250 System 1
  • Construction Hoist Building Lifter SC250 System 2
  • Construction Hoist Building Lifter SC250 System 3
  • Construction Hoist Building Lifter SC250 System 4
Construction Hoist Building Lifter SC250

Construction Hoist Building Lifter SC250

Ref Price:
$20,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Construction Hoist Description


Feature: Construction Hoist                       Condition: New                                           Application: Construction           

Payload(kg):2500                                          Lifting Speed(m/min):33                             Motor Power(kw): 3*11

Safety Device: SAJ50-1.2                              Cage: Single                                              Counterweight: No

Certification: CE,ISO                                      Place of Origin: China(Mainland)              Model Number: Type:SC250

 

Packaging & Delivery of Construction Hoist 

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist

● The gearing adopts imported bearing, enameled cable, and oil seal.


● The electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG.


● The racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts.

 

● The steel structure uses quality steel from famous domestic manufactures.


● The surface of the structure can apply paint-spray, parkerozing baking finish or hot galvanizing processing according

    to users requirements,


● The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminm board.


 

Construction Hoist Specifiction


Construction Hoist Building Lifter SC250

Construction Hoist Building Lifter SC250


FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons.

Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
Layer should be made from steel door frame, Shanghai silk screen, and is equipped with solid and reliable locking device, elevator door layer, the process should be hanging cage crew operations, shall not be under the direct control of elevator lift cage's movement. The net height should not be lower than 1.80 m, and the width of the door should not be greater than 120mm.
Q:How many people are there for construction workers
The elevator is a vertical elevator with electric motors, which is equipped with box pods for multi-storey building and carrying goods. There is also a terrace, which is running continuously on the crawler, commonly known as escalator or automatic walkway. A fixed lifting device for the floor. Vertical elevator has a car, running on at least two columns of the vertical or Angle is less than 15 ° between the rigidity of rail. The size and structure of the car is convenient for passengers to enter or unload cargo. Traditionally, the elevator is the general term for vertical transportation in buildings, no matter how they are driven. Speed can be divided into low speed elevator (1 m/s), rapid elevator (1 ~ 2 m/s) and high speed elevator (2 m/s). Hydraulic elevators were introduced in the mid-19th century and are still being used in low-rise buildings. In 1852, the United States developed a safety elevator for wire rope lifting. In the 1980s, there was further improvement in drivers, such as the electric motors, which were driven by worm gears to turn the winding drum and balance weight. At the end of the 19th century, the friction wheel drive greatly increased the lift height.
Q:How does the construction lift fall without electricity
The lockers are finished with the report, unless there is a problem
Q:Is the construction elevator a special equipment
The construction elevator is a special equipment. Special equipment is related to life safety, greater danger of boilers, pressure vessels (including gas cylinders), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities and field special motor vehicles (factory) in these eight types of equipment. In order to guarantee the safe operation of the special equipment, the state of all kinds of special equipment, in three stages: from the production, use, the examination has strict rules, is a whole process supervision. According to a 2013-2017 China special equipment inspection testing industry market foresight strategic planning and investment analysis report statistics, by the end of 2011, the national special equipment comprehensive inspection agency has reached 545, including quality inspection department inspection institutions, industry inspection institutions and enterprises self-checking, in addition to type testing institutions, nondestructive testing institutions, cylinder inspection institutions, etc.
Q:When does the construction elevator take off?
If the elevator is installed later, can the construction elevator be demolished at this time? It should not be removed because the elevator is used by the local technical supervision bureau. The unused elevator will be fined 5-200, 000 fine and the elevator installation unit will be revoked. No one will take that risk! It is usually done on rooftops, indoors and outdoors, and the materials have been transported upstairs. It is best to be able to remove the elevator when it is finished, so it doesn't affect the progress.
Q:The working principle of construction elevator
How the elevator works: The main bearing structure is self-formed system, which is low on construction. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator.
Q:How large a leakage protector is used for the construction elevator
A leakage switch with a rated current of 100-160a. The rated action current of the second class is 50-75hm. The rated action current is 30-45hm. The action time is less than or equal to 0.1 s. Comply with safety specification according to this construction.
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
The concrete pump, which can be raised in a certain radius, is the tower crane.
Q:How to save the elevator accident
Take escalator safety knowledge Passenger escalator before to keep checking your shoes clothing habits should fasten shoelaces wear skirt drag clothing such as optimum rolled up against the edge of the elevator, comb plate drag or stuck passengers carry baggage increase the risk of escalator accident now need extra or simply choose to take the stairs Escalator self-help hair accident? Every escalator, the stop button and denier hair escalator accident near the button passenger safety awareness should be kept between the first button escalator automatic stop energy efficiency to reduce accident damage Take escalator Cheng Shen fall should use to protect themselves as to avoid the rot slip or fall high neck should hands fingers crossed by strongly impact the dangerous clasped, protect brain neck elbows forward cover bilateral temporal pour knees bending forward as far as possible to protect the chest abdominal viscera side found important discoveries escalator before the sudden fall should the horse stopped footstep simultaneous for help inform passengers will forward near the accident should maintain a stable mood calm reason for avoiding the accident hair running blind hair stampede damage
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
There is a detailed picture of the elevator. The structure of the elevator well and the layout of the embedded parts.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords