Cantilever Formwork with Best Quality and Easy Installations

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever FormworkPJ200 & PJ240,CB-240 etc.

The cantilever climbing formwork has two kinds of climbing units, they are Pull-push prop climbing unit and Truss climbing unit. Compared with each other, the latter is better for the construction form of heavy load, higher height and less declining angle.

Cantilever formwork is used in dams, piers, retaining wall and cooling tower etc.

All the concrete side-pressure is borne by the anchors and the brackets. As there is no through-wall tie-rod, the concrete is very clean.

The formwork can be moved backward by 600mm for cleaning the formwork and fixing the reinforcing steel bar. Waler connector is used for connecting the form to ensure form alignment.

Form can be pushed to the already cast concrete by turning the adjust carriage to avoid concrete offset or leakage.

The formwork can be moved freely as you request. The formwork can be inclined backward and forward. Max. angle: 30°.

High standard elements can be widely used.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Best Quality and Easy Installations

 

Cantilever Formwork with Best Quality and Easy Installations

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How old do you have to be to get a scaffold piercing with parent permission?
an industrial and a scaffold are the same thing, why would they allow it to one name of it but not the other, and most piercings you have to be 18+ to get, and some you can get at 16, very few you can get any younger than that
Q:Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
Bowl button steel scaffolding is not commonly used, so the relative price of a little higher
Q:Danse Macabre, and March to the Scaffold. Are they similar? What musical elements are included?
they are both similar as the both revolve around death
Q:A 200-N scaffold is held up by a wire at each end.?
Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
Q:As Dimmesdale stands beside the scaffold, what does the crowd expect him to do?
e. do his own homework Only joking. It's definitely d. Or c.
Q:Does scaffolding piercing hurt more than snug piercing?
A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
Disclosure and protection acceptance. General projects include: frame protection, material, load, channel. Option A, B error.
Q:Should I get a scaffold piercing or a second piercing on each ear lobe?
They are near impossible to get rid of and may never stop growing.
Q:what is differences between scaffold and scaffolding?
Scaffold is what scaffolding is constructed of.
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
Bowl buckle scaffold does not require the interface should not be in the same span, and the bowl buckle scaffold is not allowed to mix and match the length of the vertical pole, must use the same height of the vertical pole or cloth from the same vertical pole

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range