Product Description:

Building Hoist Description

The construction hoist product  produced by Fangyuan has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And Fangyuan is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad.

 

Building Hoist Features

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system
. 

Specifications

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage construction elevator can be changed into single cage type, such as SCD200.

Model

SC200/200

SC200/200BP

SCD200/200

SC200/200B

Configuration

Standard type

Frequency conversion

Counterweight type

Export type

Rated load

kg

2000/2000

2000/2000

2000/2000

2000/2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

16/16

16/16

16/16

Max.lifting height

m

150

300

150

150

Max.height of free end

m

9

9

9

9

Lifting speed

m/min

33

0~60

33

33

Capacity of small hoist

kg

200

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×3/11×3

11×3/11×3

11×2/11×2

11×3/11×3

Speed limiter

Action speed

m/s

1.2

1.45

1.2

1.2

Rated brake load

kN

40

40

30

40

Model

SCD200/200B

SC100/100

SCD200

Configuration

Counterweight type

No counterweight

Counterweight type

Rated load

kg

2000/2000

1000/1000

2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

12/12

16

Max.lifting height

m

150

150

150

Max.height of free end

m

9

9

9

Lifting speed

m/min

33

33

33

Capacity of small hoist

kg

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×2/11×2

11×2/11×2

11×2

Speed limiter

Action speed

m/s

1.2

1.2

1.2

Rated brake load

kN

30

30

30


 

FAQ of Construction Hoist

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why is the construction elevator not so close to the structure?
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:Where is the location of the elevator in the project
The position of construction elevator is usually set in the project to facilitate access to material, material handling and personnel up and down, not affecting the construction process.
Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use
Q:How does the elevator operate
Responsible for operating elevator, maintenance, maintenance and safety. See what kind of elevator and workplace you are working on.
Q:How large a leakage protector is used for the construction elevator
If it is 33KW, direct start, single cage, 160A, leakage action current 50ma-75ma, movement time 0.1 s, electrical machine leakage protector. The best.
Q:Safety device for construction elevator
Many 1, 2, upper and lower limit for safety device 3 TDD, extreme limit 4, buffer spring 5, has threshold position switch, single threshold position switch 7, 6 top and limit switch 8 TDD, enclosure door lock 9, lock line 10, has locks There are a lot of electrical safety protection
Q:How many years does the construction elevator usually use?
Wire rope derrick type: 5 years Gear rack: 8 years After the accident, the person in charge will be unlucky
Q:The construction elevator can not operate during the use of several stages of wind power
11, when the wind speed exceeds 20m/s and the bad weather, such as hail, not use the lift." I'm a construction elevator This is the norm It's about a six-stage wind by 20m/s.
Q:What is the meaning of double straps in the construction elevator?
One component of the elevator's drag system is the weight of the car. The other side of the car is connected to the top of the car by dragging a wire rope. It can be used for the energy saving of the elevator towing system, because the elevator load optimization is calculated by the theory calculation. The elevator should be calculated before the weight is weighed: the calculation principle is that the weight is equal to the weight of the car and half the load.
Q:Should a fire extinguisher be equipped in the construction elevator?
A fire extinguisher will be required for the 500kg of manned cargo construction elevators at 500kg or more.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range