Asphalt Roofing Felt(ASTM STANDART)

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
4000 Square Meter m²
Supply Capability:
300000 Square Meter per Month m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Detailed Specification of Asphalt Roofing Felt:

 

Item

Width

Length

Weight

Thickness

Usage

ASTM D-226 roofing felt 30#

36in

0.914m

72ft

21.95 m

23.5kg 

1.2mm

A roofing felt

used as an underlay beneath asphalt shingles, wood shakes,

 tiles and other

sloped coverings.

ASTM D-226 roofing felt 15#

36in

0.914 m

144ft

43.89 m

23kg

0.8mm

ASTM D-4869 roofing felt 15#

36in

 0.914m 

144ft

43.89m 

16.5kg

0.6mm

ASTM D-4869 roofing felt 30#

36in

0.914m

72ft

21.95m

13.5kg

0.8mm

 

 A heavy-weight Asphalt Roofing Felt made of a specially formulated organic sheet which has been fully saturated with waterproofing asphalt.

 

 Pictures of Asphalt Roofing Felt: 

Bitumen Roofing Felt

 

Asphalt Roofing Felt 

 

Use of Asphalt Roofing Felt: 

A roofing felt used as an underlay beneath asphalt shingles, wood shakes, tiles and other sloped coverings.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Need to waterproof the external walls, there are several programs. First, directly in the existing external walls of the main surface of the water treatment, the use of technology and materials due to different external finishes and different;
Q:What material waterproofing can be mixed with cement sand
Construction can be made with the waterproofing agent and cement made of waterproof mortar. The ratio of cement to sand is 2: 3, and the amount of waterproofing agent is 1% of the cement.
Q:Bathroom first leveling or do waterproof, what is the difference
Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
Q:Eastern rainbow waterproof how to do
especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
Q:Waterproof material water leakage construction should pay attention to what
3, do the closed water test After the waterproof construction is completed, the water storage test. Will be blocked all the toilet outlet, the door at a pound of about 200mm high barrier, and then poured in the bathroom about 20mm ~ 30mm deep water, and 24 hours after the inspection of the walls and the ground around the leakage phenomenon , Waterproof test is to ensure the quality of the bathroom waterproofing the key, we must do. Such as after 24 hours without leakage as qualified. If you find a leak, you should immediately stop the water storage test, re-waterproof layer to improve the treatment, after passing the water test.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
4, the preparation of finished products: according to the pavement area required to calculate the semi-finished products, the required slurry and prepolymer were lifted to the console, according to batch release neatly. Place the desired vinyl particles and catalyst into the appropriate position on the table.
Q:What is the price of a waterproof window cover?
2, the bottom liner Composite sets of most of the finished use of the bottom liner and decorative panels. Market sales of the bottom liner and decorative panels are 1220 * 2440 mm specifications, the bottom liner thickness of 18,15,12 mm three, the production of doors and windows or cabinet liner thickness of the use of 18 mm. Bottom liner according to the different materials, is divided into blockboard, MDF, particleboard, melamine board. Commonly used for blockboard and MDF.
Q:Can acrylic materials be perforated? How to do waterproof after punching?
It is best not to drill in the finished product on the screen, if it is absolutely last resort, You can use fiberglass material in the hole position paper;
Q:Can Henkel have water against him?
Add a small amount of water is possible because the premise of waterproofing should also be wet before the grassroots
We are specialized in the production and marketing of Waterproofing Materials and Machinery.

1. Manufacturer Overview

Location Hebei, China
Year Established 2004
Annual Output Value Above US$ 100 Million
Main Markets America; Europe; Asia; the middle east
Company Certifications ISO 9001

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Tianjin
Export Percentage 50% - 100%
No.of Employees in Trade Department 6 - 10 people
Language Spoken: English; Chinese
b)Factory Information  
Factory Size: 20000 square meters
No. of Production Lines Above 5
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range