Tensile Membrane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

ceiling roof material1.5mx50m
Waterproof Class W1
SD-value 0.02m
Vapor permeability: 2250g/m2/24h
UV re

1) Introduction of  ceiling roof material

  1.    Breathable Membrane is a water resistant membrane but with high vapour permeability, use as diffusion open roofing felts under pitched roof tile or vapour permeable barrier housewraps on timber frame walls

  2.    Breather membrane functions as a weather-resistant barrier, preventing rain from getting into the roof or wall assembly while allowing water vapor to pass to the exterior.

  3.    Breather membrane may also serve as an air barrier if it is sealed carefully at seams.

  4.    Breathable Membrane have good "water resistance", good "water vapor permeability", and good "air barrier properties".

2) ceiling roof material Specification
13-layers laminatedPP nonwoven+PE film+PP nonwoven
2Products range80g,90g,100g,120g,140g,160g/m2.
3Roll size1.5m x 50m
4Water resistantClass W1
5SD-value0.02m
6Vapor permeability>2250g/m2/24h
7UV resistant>3month
8Test to EN13859-1Pass -- CE mark available

3)Key Features of ceiling roof material

1CE certificated, high quality with competitive price
2Waterproof & vapour permeable
3Excellent tensile and nail tear strength
4Good flexibility and ductility
5Light weight and thin, slip-resistant surface
6Simple handling and easy to use
7Energy saving
8Long term durability
9Totally recyclable
10For both wall and roof applications


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why should the use of high pressure perfusion waterproof plugging method
Due to uneven settlement of buildings and other factors, resulting in deformation of the building structure cracking, leakage phenomenon, for the repair of this situation, you can use a new foreign plugging construction technology - high pressure grouting waterproof repair technology.
Q:What is the car material so that the car can be waterproof, in the rain will not leak in?
Engraving process car sticks A. knife engraving process: refers to the computer will be vector graphics input knife machine, the knife will be cut into a preset film shape, and then by hand will be different colors together Finished, and finally in the finished product posted on the surface of a layer of transparent transfer film, after the stickers to remove the stickers; due to knife car paste production process is complex, high cost of materials, currently only suitable for individual car and Che Youhui team Small customization
Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ​​leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:Hello, roof with SBS waterproof material bulk density is how much?
Similar to styrene-butadiene rubber, SBS can be in contact with water, weak acid, alkali, etc., with excellent tensile strength, surface friction coefficient, low temperature performance, excellent electrical properties, good processing properties, as the current consumption of the largest thermoplastic Elastomer.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
4, the preparation of finished products: according to the pavement area required to calculate the semi-finished products, the required slurry and prepolymer were lifted to the console, according to batch release neatly. Place the desired vinyl particles and catalyst into the appropriate position on the table.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q:How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q:What is the difference between finished mortar and cement mortar?
Finished mortar and cement mortar difference: Cement mortar is the synthesis of three main materials, cement, sand and water, and mixed mortar is the synthesis of four major materials, cement, sand, lime and water.
Q:Bathroom first leveling or do waterproof, what is the difference
2. Grass-roots waterproof, materials, local conditions, with particular attention to the wall and root and other vulnerable parts of the leakage, should do some special waterproof, plugging treatment. Stir the waterproof material, the first layer of the coating should be waterproof material scraper evenly coated on the base surface, the thickness of 0.6mm or more, to be uniform, the first wall after the operation, from the inside out of the operation , Can not have local deposition, leaving no bubbles, strong bonding. Ground waterproof layer should be painted out of the bathroom door outside the 300 wide, should be higher than the ground 200, shower wall waterproof layer should be higher than the ground 1800mm. The next brushing direction is perpendicular to the last time. The last time the film semi-curing, throwing coarse sand particles, easy to combine with the cement mortar in the future. To be dry after a few days to do closed water test, observe no leakage side good.
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
2, when the basement depth is large, it is impossible to dig a place in time, you can use the reverse construction method, that is, dig a certain depth, then finished a section of retaining wall, to be a certain strength, and then open Dig, do the next retaining wall, and in this order until the construction to the specified design depth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range