Aluminium Duct Aluminium Ductings Flexible Duct
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Application and benefits of Flexible Duct
-Applied in air conditioning/ventilation systems
-Tear and puncture resistant
-Corrosion resistant
-High flexibility
-Convenient installation
-No toxic gas emission
Non-insulated Flexible Duct
Structure: double-layer aluminum foils +1 layer of PET film.
Structure: 1 layer aluminium foil+ 1 layer of PET film
Insulated Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu.foil
Glass Wool Density: 16kg/m3; Thickness: 25mm
Insulated Acoustic Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film
Glass Wool Density: 32kg/m3; Thickness: 25mm
Combined Flexible Duct
Structure: flexible duct PVC jacket.
REMARK: Special structure is available according to customer's requirements
Pictures of Flexible Duct
FAQ of Aluminium Flexible Duct:
1. What temperature maximum? Our products: 150℃ and 250℃
2. What MOQ? Our MOQ: 500 pcs
3. What payment terms? We accept T/T and L/C
4. Lead time: 10 days
5. Packing: Nest packing for non-insulated flexible duct, then into plastic bag for non-insulated flexible duct or packed in individual carton box.
- Q:Do you have a natural gas hose in the flue?
- Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
- Q:The sound of water pipes will not produce infrasound damage to the human body?
- Most of the polyethylene benzene board insulation, paste the external walls.
- Q:How to optimize the construction management to improve the quality of construction projects
- I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
- Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
- The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
- Q:Is the flexible sleeve of the broken wall used as a second retest?
- Safety nets, helmets, seat belts, insulated gloves and so on
- Q:Why should the flexible hose be set in the mechanical ventilation system?
- The contents of the special construction plan: engineering overview, preparation basis, construction plan; process technology, safety assurance measures, labor plans, calculation books and related drawings.
- Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Home appliances to the countryside sales business first of all should go to the local Bureau of Commerce for the record, after authorization, the monthly sales of home appliances to the countryside information information log system, and the corresponding sales invoices, product identification card, the buyer ID document copy Reported to the local financial institutions (usually the local financial office), and then the financial management of your sales information to review, grant subsidies
- Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- 1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
- Q:Does the desulfurization and denitrification equipment use metal hoses?
- Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
- Q:How to effectively deepen the construction process management to improve the quality of construction projects
- Oh there seems to be no. I have not seen on the Internet, if there is a thank you to thank
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminium Duct Aluminium Ductings Flexible Duct
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords