Aluminum Insulation Flexible Duct For Ventilation Use

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
20000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications
Insulated aluminum flexible duct

extension rate:1:10

Low /medium pressure central HVAC system flame and heat resistant

Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting

 

Material:

Double layers of aluminum foil reinforced with high tensile spring steel wire

Structure: High elastic wire, aluminum foil. A reinforcement model can be required.

Aluminum foil thickness: 0.035mm

Temperature range: -30°C~+140°C

Maxim Air Flow: 30m/s

Maxim working pressure: 2500 pa

Standard Length: 10m/pc  Or as your requirement

Fire resistance: Non flammable.

Normal packing: In carton. Or as your requirment

Application: Low /medium pressure central HVAC system and ventilation system.

Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc

Description

100% Non-asbestos 

Raw Materials

Cement,Quartz Sand,Paper Pulp,etc.

Standard Size

1220mm×2440mm or 1200mm×2400mm

Max Width

1220mm

Max Length

3000mm

Thickness

4-20mm

Density

1.30-1.50g/cm3

Color

Light yellow or Grey

 Data

Width: 600, 1000,1200mm

Length: 600,1200,2300mm

Thickness: 25-100mm

Density: 24-96kg/m3
Thermal conductivity: 0.034-0.048W/mK

Aluminum Insulation Flexible Duct For Ventilation Use

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Will metal hose be used on the wastewater treatment equipment?
Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
Q:Why should the flexible hose be set in the mechanical ventilation system?
The contents of the special construction plan: engineering overview, preparation basis, construction plan; process technology, safety assurance measures, labor plans, calculation books and related drawings.
Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
Q:What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
Q:Two hundred galvanized pipe should be under the large flexible tube
We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long and 4m each) and the fasteners are transported to the hanging plate of the frame
Q:I am sorry to see your answer in Baidu, can I also pass a copy of my construction and decoration project example?
First of all you have to check the pipe into the inspection, there are inspection data: product certification, the national inspection report, approach the size and quantity; at this stage to do the main inspection and inspection and shelter project inspection data, the need for quality The person in charge of the signature, the supervision engineer signed, you find some of the wages of the official Gongjia pull the yellow rule of the sea to see the sea, there are templates on the top, you can go to Sina love to download the knowledge.
Q:How is the flexible casing of the fire pond connected to the tube?
EPS expansion polystyrene board: is a volatile liquid blowing agent containing polystyrene (eps) beads, preheated by heating after the mold in the mold, with fine closed-cell structure characteristics
Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
When connecting, first thread the bottom of the connector, and then screw the tapping screw into the threaded bottom hole of the connected part. As the tapping screw thread surface has a high hardness (≥ 45HRC), can be connected to the threaded bottom hole in the internal thread, thus forming a connection.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range