good quality wire mesh

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

SIZE: 0.68X25MMX1.2X200M

CORE DIA. 76mm



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Go to the site to run you may have a harvest; The The The The
Q:How to strengthen the construction management and construction quality control
Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
Q:How to optimize the construction management to improve the quality of construction projects
flexible waterproof casing for seismic fortification of the region, rigid waterproof casing for the pipeline to touch the tattoo Du Gu Sen single point of the wall does not bear the vibration of the building
Q:What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:I am sorry to see your answer in Baidu, can I also pass a copy of my construction and decoration project example?
The lithium battery as long as the choice of a good shell, it does not matter
Q:What is a flexible interface and what is a rigid interface?
According to the provisions of Article 103 of the "Tower Crane Safety Regulations", the tail of the tower crane is not less than 0
Q:Is the flexible sleeve of the broken wall used as a second retest?
The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
The radial force of the seal is far greater than the axial force of the connecting bolts but all the axial force washers 窢 field urging 讵 peculiar aldehyde support, good self-sealing effect by the pipeline through the media rubber ring pressing force pressure more sealing performance of the more pressure to prevent the pressure of the rubber ring to the inner diameter of the tube end of the interface diameter Preload to prevent the media pressure leakage and the blue compared to the higher the pressure of the pipe the more the advantages of the more dangerous the pipe junction at the flexible state of the clamp and the tube between the gap between the clamp clamp a small number of adjacent pipe to allow the corner tube Pipe pipe between the end of the gap to allow the axial shift of the pipeline to adapt to the expansion and contraction of the pipe; pipe interlocking effect reduced 70% mechanical vibration
Q:The sound of water pipes will not produce infrasound damage to the human body?
Most of the polyethylene benzene board insulation, paste the external walls.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range