All-round cuplock scaffold system for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
material: | Q235 | standard: | use your standard or international standard | thickness: | 1.6mm to3mm or as your requirements |
name: | All-round cuplock scaffold system for sale | surface Treament: | as your requirements |
Packaging & Delivery
Packaging Detail: | CARTONS THEN ON PALLET,OR AS YOUR REQUEST. |
Delivery Detail: | WITH IN 25 DAYS |
Specifications
1. Reliable performance
2. Corrosion resistance
3. Durable finish standards
All-round cuplock scaffold system for sale
1. Product Information
Name | Size | Material | Tube size | Surface | Theoretic weight |
Vertical Standard | 1000mm | Q345 Steel or Q235 Steel | Φ48.3*3.2mm | Galvanized | 4.97kg |
1500mm | 7.46kg | ||||
2000mm | 9.94kg | ||||
2500mm | 12.43kg | ||||
3000mm | 14.91kg | ||||
Ledger | 600mm | Q345 Steel or Q235 Steel | Φ48.3*3.0mm | Galvanized | 2.34kg |
900mm | 3.35kg | ||||
1000mm | 3.67kg | ||||
1200mm | 4.40kg | ||||
1500mm | 5.33kg | ||||
1800mm | 6.32kg | ||||
2000mm | 6.90kg | ||||
Base Jack | 600mm | Q345 Steel or Q235 Steel | Φ38*4.0mm | Electro galvanized | 4.60kg |
Packaging & Delivery
1.Suitable qty in one carton box
2.Suitable qty packed in plastic bags, then to platte or tray.
3.20 to 25pcs in woven bags
4.20GP can be loaded about 23 to 26 tons
5.deliverying time is about 20days to 30days
Functions
It is used for construction supporting, timber, formwork, concrete slab and so on. It is very easy and reliable to use
- Q:What are the common rules for calculating the amount of scaffolding works
- The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
- Q:Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
- Maybe something like a window washers scafolding planks...?
- Q:What are the general specifications of bowl buckle scaffold?
- In fact, the conventional bowl buckle scaffold is made of 48 Q235 carbon steel pipe processing, pole specifications are 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.4m, 3.0m; crossbar specifications are 0.6m, 1.2m, 1.5m. The price of any product is determined by its consumption of materials and processing costs
- Q:Please help me in building professional people (scaffolding)
- Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding
- Q:Latch type disc scaffolding accessories are national patent products?
- Disk lock scaffolding called socket type Pankou scaffold.Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
- Q:What are the main safety problems when dismantling the scaffold
- 1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
- Q:Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
- According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
- Q:I know it's soon, but my piercings swollen and quite sore when knocked slightly.I've only had it three or four days, but there's a swollen round lump right next to one pierced hole and I was worried it could be an early sign of a keloid. But I don't know if it's too soon to tell yet.I know they can take up to 6 months to heal, if not more, but I'm kinda paranoid about it.I've rinsed it after showering, used salt water on it every day and apart from that just washed it with water on a cotton bud.Any advice?
- I had my industrial for 13 months and it never healed. I decided to retire it and the piercing sites closed up within 6 hours. Seriously, my advice to you is to just take it out. They are wayyyy more trouble than they are worth.
- Q:what happened when author dimmesdale went to the scaffolding in town square?
- Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
- Q:What is a bar in the scaffold
- Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
All-round cuplock scaffold system for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords