8T FORKLIFT for Sale FD80-W3 from CNBMM China
- Ref Price:
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Details
Condition: New
Place of Origin: Shandong, China (Mainland)
Brand Name: CMAX
Model Number: FD80
Power Souce: Diesel Engine
Rated Loading Capacity: 8.0-10.0t
Max. Lifting Height: 4330
Min. Lifting Height: 2700
Fork Width: 2165
Overall Dimensions: 10220*170*70
Certification: CE
After-sales Service Provided: Engineers available to service machinery overseas
Product Name: Forklift
Delivery:Within 3 weekes
Small FORKLIFT for Sale FD80-W3
Q1: How soon can we receive the goods after purchase?
A1: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q2: How to make a quick resolution for after service?
A2: OKorder and our manufacture both have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
Q3: How do we guarantee the quality?
A3: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Main Product Features:
· Premium quality
· Prompt delivery & seaworthy packing (20-40 days after receiving deposit)
Reliable performance
Easy and smooth operation
High safety.
· Professional Service
· Competitive pricing
- Q:Machinery!
- Check out library periodicals. I know that my school posts thousands of them online for any sort of subject you are looking for.
- Q:to start a brewery plant , where can i get machinery(complete plant setup) and what is the economical way to go, second hand, new or other options? please give details abt Suppliers, Plant contracters etc
- good luck with that. sasly probably asking here is wrong place to find out. Those that would know unlikely to be answering here. Best of luck in your new business tho.
- Q:nan
- Yes drunk, stoned and naked
- Q:Use of construction machinery
- Pump: a pump system is not installed in the car, pulling force is needed. Mobile concrete can be pumped from one place to another, simply as a separate pump. If the upward pumping is very difficult because of the weight of the concrete that you have no way to "take the 'steady conveying pipe.
- Q:In law, how many years of depreciation of construction machinery? (excavator)
- (1) housing and buildings for 20 years; (two) aircraft, trains, ships, machinery, machinery and other production equipment for 10 years;
- Q:In terms of marine or vessel machineries, I did not understand it clearly, please explain, I need your help.
- Auxiliary would be like a pump or power generator, ancilliary would be more like drill press in the mechanics shop, one is needed to service the other, or another example would be the automatic potato peeler in the mess would be ancilliary
- Q:Heavy machinery as in tractors... what would you need human labor and heavy machinery for in a horse farm
- growing feed and hay -- horses eat a lot.
- Q:To save on precious water, time and money
- The usual way for the washing machine to rinse the clothes after they have been washed is for it to refill up with clean water and slosh the clothes about for a while before draining out the water. Spray rinse is a method where after the clothes have been washed fresh water is sprayed on them as they are tumbled about , this uses less water.
- Q:nan
- Try pulping and squizing it through a industial meat grinder then drying it in a barrel or old dryer
- Q:nan
- the fee could rely on how large the plant replaced into. you are going to be able to desire to start with a bypass decrease paper shredder and a 5 gallon (19 liter) bucket and a water faucet. So it would desire to fee everywhere from approximately $one hundred to $a million.5 Billion, i assume. additionally the earnings could rely on the size and performance of the plant and the quantity and fee of hard paintings required.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
You Might Also Like