JCM913D Hydraulic Crawler Excavator Digger Mechanical Shovels
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab on a rotating platform known as the "house". The house sits atop an undercarriage with tracks or wheels. A cable-operated excavator uses winches and steel ropes to accomplish the movements. They are a natural progression from the steam shovels and often called power shovels. All movement and functions of a hydraulic excavator are accomplished through the use of hydraulic fluid, with hydraulic cylinders and hydraulic motors. Due to the linear actuation of hydraulic cylinders, their mode of operation is fundamentally different from cable-operated excavators.
Main Product Features:
There are 3 pumps: the two main pumps are for supplying oil at high pressure (up to 5000 psi) for the arms, swing motor, track motors, and accessories, and the third is a lower pressure (700 psi) pump for Pilot Control.
The whole machine has the elegant streamline design, reliable performance and high efficiency of working.
Possess quality certification of ISO 9001:2000. Can pass CE test.
A wide range of operating weight & bucket size for your choice.
We can supply OEM service and can also produce according to your requirements.
Product Specifications:
Operating Weight: 12.8t
Engine: CUMMINS B3.9-C
Boom Length: 4.6m
Arm Length: 2.5m
Bucket Size: 0.55m3
Operating Weight and Ground Pressure | |
Operating weight includes basic machine (with boom 4.6m, arm 2.5m, and bucket 0.55m3) | |
Shoe width | 500mm |
Overall width | 2500mm |
Ground pressure | 39KPa |
Operating weight | 12800kg |
FAQ:
Q1: How to control the Excavator?
A1: The Excavator is equipped with the open-and-shut electronic monitoring system and fault alarm system, very easy and safe to control.
Q2: How do we guarantee the quality of our products?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce some Excavator according to customers request?
A4: Yes, we can produce Excavator according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q:Hi Everyone! I desperately need help Finding this fic even the Title will do.Been looking everywhere for this fic but I just can't seem to find it.Summary:There is an explosion in the well house that buries the time portal. Kagome's mother tells her it will take two months before excavators can even come. In the rubble she finds a piece of stone from the bottom of the well that's been carved into;
- I assume the title is Hinatu. I can send you the fic in an e-mail.
- Q:Dump trucks, earthmoving, shovel loading, vehicle distance from 48km, according to 2014 valuation quota,
- No provinces, highways, grades and other information, bad calculations, calculated fluctuations in unit prices.I borrow the earth fill group price detailed apply and adjust quota information to you, set yourself:First, 1-1-9 excavators dig earth and stonework, and pay attention to that when the volume of fill compaction is taken as the quantity of the project, and the quota of the natural compacting unit as the measuring unit, the quota adopted shall be the following coefficient:Turn left and turn right |Excavation and transportation should also increase transportation losses by 0.03. Don't forget to add extra rolls to the mill.
- Q:What's the average price, per square foot, to have a foundation dug out?
- There is no such thing. Get a bid from an excavator. The price will reflect, among other things, how long it will take to do your job, which will depend on how deep, where you want the dirt put and what the ground is like.
- Q:Thanks a lot.
- 'Bucket boom'. The 'cherry picker' is the basket the men stand in.
- Q:What kind of excavator does Nissan brand have?
- The common Komatsu, KOMATSU (Tokyo), Kobelco KOBELCO (Kobe), Hitachi HITACHI (Tokyo), Sumitomo SUMITOMO (Chiba) etc.
- Q:We aren't looking for any fancy fence or tile or lights or a diving board (in fact we don't want lights or a diving board, and we were going to use a manual cover). So we would like to know how much all this would cost initially and how much it would cost to install. I live in Naperville IL., and help would be appreciated, thanks.
- Initially? Well, you know the price of your kit already. You'll need a contractor to come in to give you an estimate. Sorry, but all backyards are different. The contractor may have to go to a smaller excavator for access ( which takes longer to dig and drives up the price), he may even have to hire a crane to get the excavator in and out of a difficult backyard, the pool you want may not even be possilbe and stay within your municipal bylaws too. The contractor will know all this and they'll usually give you a free quote. There are just too many variables to answer this accurately without seeing it and knowing your own local codes. I can give you a ball park starting figure for the whole shebang. Expect a cost starting of at least 23 grand and it only goes up from there.
- Q:We built our own house two years ago and moved in April 2008. We had the excavators back-fill after inspections. Since then the soil has been settling down to the point now I can see the top of the tar on the foundation. How long does this continue? It seems to have slowed down this past year, but it has messed up my plans of planting around my house. I want to put more dirt around the foundation to build it back up where it is suppose to be, but then I'd have to wait on that to settle. That is a lot of dirt. I'm debating on doing it myself or have the excavator come back in and do it for me.
- Ground Settling
- Q:I'm looking for a job in San Diego CA, In the La Mesa and EL Cajon area. I'm willing to drive 50 miles for a job. I'm wondering what are all the underground Construction Companies for Excavator Jobsin my area or 50 miles from here? So i can apply to those companies for a job. Only serious answers please. Thank you! really appreciate the help! (: I have more than 20 + years of experience.
- Hope okorder /
- Q:what do you do when your horse has died?I have always wondered where you send them and what do you do with them?..can you give me your answers and what you think?
- The body of a horse who has died can go to a renderer, be buried or be creamated. If your horse has died at an equine vet school teaching hospital, you can donate his body to help new vet students learn about horses. When any of the horses at my farm had to be euthanized, I worked together with my vet who coordinated the euthanization with the guy from the rendering place. When one of my clients wanted her horse creamated, she contacted them and then a time was arranged with them and my vet.
- Q:How much does it cost in gas to run an excavator for 10hrs a day?
- depends on the size, eg: 20tonne komatsu at what we call full load conditions, big bucket loading sand non stop will use about 12-15 litres/hr on a hot day with A/C on, oh then operator's wages, payment, tube of grease, blah, blah, blah
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
JCM913D Hydraulic Crawler Excavator Digger Mechanical Shovels
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords