Specification of Self-Propelled Telescopic Boom Lifts GTBZ22S & GTBZ24S

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Brief introduction

Our  products have been distributed in various areas, like manufacture and maintenance of aircraft and vessels, construction and installation, road and bridge construction, municipal engineering, warehousing, supermarkets and so on. In addition, company also offers special products to Chinese military. All our products have gained approvals of CE, and widely sold in Europe, America, Asia, Africa and other 80 countries and regions. 


 Specification of GTBZ22S & GTBZ24S







Max. Occupants


Max. Working Height



Max. Platform Height



Max. Horizontal Reach



Turntable Tailswing


Overall Length(A)



Overall Width(D)


Overall Height(C)


Platform Size


Ground Clearance(E)


Wheel Base(B)


Turning Radius(Inside/Outside)


Turret Rotation


Platform Rotaton


Jib Movenent


Engine Perkins 404D-22T


Engine Deutz D 2.9 L4 Option




Travel Speed(Stowed)


Travel Speed(Working)




Maximum Slope

Hydraulic Tank


Fuel Tank




Gross Weight




 Images of  GTBZ22S & GTBZ24S

 Specification of Self-Propelled Telescopic Boom Lifts GTBZ22S & GTBZ24S

 Specification of Self-Propelled Telescopic Boom Lifts GTBZ22S & GTBZ24S

More details of GTBZ22S & GTBZ24S

● Standard equipment
 Can Bus Technology
● Proportional controls
 Safety electric pump
● Hydraulic platform rotation
● Anti-restart engine protection
● The glow plugs for cold starting
● Oscillating axle
 Extendable axles

● Horn
 Hour meter
● Overload sensor with alarm
● Tilt alarm
● 360°continuous turntable rotation
● Self-leveling platform
● Onboard diagnostic system


(1)What kind of product scope do u produce?

Our products have 6 series (more than 80 models), including Telescopic Booms, Articulating Booms, Scissor lifts, Vertical lifts, Mast-Climbers, Aerial Order Picker and so on.

The company has successfully passed three management system certifications of ISO9001, ISO14001 and OHSAS 18001, and obtained the Manufacture License of Special Equipment.  

(2)What's the main characteristic ?

 ● ±90° platform rotator

● Jib(Range of Articulation) 130 Degrees (+70°/-60°)

● Swing out engine tray for easy maintenance access

● On-Board diagnostics help operators troubleshoot on the fly and make adjustment in the field to maximize uptime

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why are most Communist coat of arms depicting machinery?
Q:Can anyone understand the enormous challenge of rising above the Clinton machinery?
Agreed...I have been an Obama supporter since day one, but even I could not have envisioned this. I figured that i would end up having to vote for Hillary in November..I am pleasantly surprised that so many people have joined me in taking a chance at having something better
Q:Tire repairing machine for engineering machinery
Direction: tire tread on the running of the drain slip is particularly critical, so the cross-country car tire commonly used arrow pattern of asymmetric sign assembly to ensure that the design of the rolling direction, adhesion, and antiskid performance. If you pretend to be wrong, it is counterproductive
Q:I want to start export machinery spare parts from india, how do I start?
Go to your board of trade in your community,importing Exporting the canadain goverment has booklets,when you dealing with another country you have to register your bussiness thats,insurance,bondable,frieght insurance,and the person that can help you is a custom broker there in the yellow pages,and you would have to look upindia custom,there tarrifs,its a lot but my suggestin is look for gov help,look on web site exporting products
Q:what machinery do they use to make donuts?
check okorder.com/
Q:Will it ever be possible for scientists to physically stop a earthquake with any machinery or something like t?
I doubt it Earthquakes are caused by Teutonic plate movement. Teutonic plates are big.
Q:I need help choosing machinery for a coffee shop I will be opening!?
I'll advise BUNN coffee machines, they are not so expensive that is important if you are just espablishing your small business
The brake horsepower is the power delivered to the load by the engine under specified operating conditions. The engine delivers 30 X 745.7 = 22371 watts to the generator. A machine described as a 20 kW, 200 V shunt generator would be assumed to be a DC generator with a nominal rating of 20 kW at 200 V dc. It would be capable or delivering 20 kW, but the actual delivered power is not stated. You could assume that the generator is operating at full load. If that is the case, the total losses, copper, iron and friction would then be 22371 - 20000 = 2371 watts. If you have been given that the iron and friction losses are 1039 watts, the copper losses must be 2371 - 1039 = 1331 watts. There is no information given in the problem, such as armature and field resistance, that could be used to calculate the copper losses. If you had that information, you could calculate that the copper losses are 1331 watts and from that calculate the iron and friction losses. Are you sure that you are not supposed use machine specifications provided in another problem?
Q:I think drug testing is bullshit, unless you operate or are responsible for heavy machinery. Agree?
i can see from both sides. FOR: it makes sense that an employer would not want to hire someone who is an alcoholic, becasue if they get drunk off their *** one night, and have to be at work at 8am the next day, how will they perform? if they even come to work? AGAINST: why is it their business? they dont have to assume that just because a person does drugs that they are not a hard worker or that they are unreliable. i was about to try drugs for the first time, and the day before i got a call from target saying that i was hired, and needed to take a drug test. i had put in my application almost a month ago so i figured they didnt want me, so i said to hell with it and was gonna do it. but i didnt and i got hired. i dont think it should be mandatory, only if there is a suspicion of it, or if like you said, you are operating machinery or something.
Q:Is it legal in the state of Florida for an employer to make an employee pay for damages on machinery?
did the boss approve the extra time did your shift supervisor approve it if no to the two then no they dont ought to pay you as you volunteered to do the extra advantageous artwork artwork nor authorized via administration beforehand of it being finished may be seen as volunteer artwork did somebody ask you to stay over if not you worked for unfastened regrettably its legal you chosen to stay and artwork without consent subsequently they dont ought to pay you

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range