Led Curtain Lights For Wedding Decoration

Ref Price:
Loading Port:
Shanghai
Payment Terms:
L/C,T/T
Min Order Qty:
100 Sets set
Supply Capability:
100000 Sets set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

LED holiday lighting; holiday lighting with Best price; high quality of holiday lighting

 

Feature

One bulb from each drop randomly twinkles

Suitable for indoor or outdoor applications

Bright vivid colors from light emitting diodes

If one light goes out, the rest will stay lit.

Can easily be hung, hooked, or screwed to any surface allowing for greater installation flexibility

CE,ROHS

 

Application

Lighting decoration for Party, Wedding, Restaurant, Hotel, Building, House, Shopping center, Pub, Concert, Show, Hall, etc.

Ultra slim to be easy for decorating anywhere. Cool enough to be put on costumes, clothing, live foliage, poinsettia and seasonal plants, table top trees, etc.

 

 

Custominzing Options

Various Colors options;

OEM/ODM available, can print your logo on products.

 

Packing & Delivery

Pakcing:

Standard packing or customized packing;

Cartons outside.

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does elevation lighting mean?
Facade lighting of buildings in our country, in the past the festive lights installed along the building outline, this way is simple, but it is difficult to reflect the building itself stereoscopic, artistic effect is poor, and large power consumption. In recent years, more and more using light as a light source
Q:LED lighting energy-saving transformation really good?
Energy unit production workshop is originally used 36 watt fluorescent lighting, a year about 627 thousand yuan electricity; energy saving lighting, replace the original fluorescent lamp 2460 using 2460 LED 16 watt fluorescent lamp; a year is about 369 thousand yuan.
Q:Jiaxing Shenghui lighting treatment?
3 holiday benefits (generally 4, development space is generally stingy)
Q:The problem of intelligent lighting control
Outdoor power is generally larger, such as street lights, factory lights, the application environment is relatively poor, moisture-proof, dustproof, high temperature needs to
Q:What are the main points of power distribution and lighting energy-saving supervision?
, strictly check the curtain wall energy saving project materials, components, etc., and their varieties and specifications shall comply with the design requirements and relevant standards.
Q:CREE semiconductor lighting pay no
In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
Q:What are some good suggestions for plant energy saving lighting modification?
The factory is the national advocate energy-saving lighting transformation,
Q:Lighting line connections?
2 parallel circuit: the circuit elements are connected together, the characteristic is: the current sanctions in the two part of the road branch, respectively through the two branches of the various components.
Q:How to choose lamps and lanterns? Inventory factors affecting consumer spending
When are consumers accustomed to buying lights at nodes? Consumers know brand information through those channels? How to choose lamps and lanterns
Q:Aomori Festival
Time is not a holiday, the city of Aomori is August 2nd to 7, Hirosaki city is August 1st to 7, five in August 4th to 8 is set up. People use traditional Japanese paper to make huge square paper seat lights and parade them up and down the streets with their lighting.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range