High quality and low price Full electric picker FP

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product feature:
Use of high-quality drive systems and pumping stations,lifting and running is smooth and powerful.
Configure large-capacity traction batteries, power lasting long, durable and reliable
With a seat belt, seat belt firmly connected with the roof, to ensure operator safety
Apply to the Treasury, workshops, supermarkets, stadiums and other high-altitude operation or maintenance operation selected

ModelUnitFP

Load capacity

Kg500

Wheels size

mmΦ140*80

Wheels material

PU

Min. turning radius

mm1920

Max. lifting height

mm2700

Loading platform(forks)size

mm800*620  

Manned platform size(L*W)

mm840*600  

width of Single fork

mm150

Lifting speed

m/min5

Lowering speed

m/min4

Pumping power

KW/V2.2/24  

Batteries (traction battery)

Ah/V210/24  

Driving wheel

KW/V1.2/24  

Walking speed

Km/h6

Dimensions

mm1350*800*1800

Net weight

Kg1230

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the five major cost components of the project cost?
Material cost means the amortization of the raw material, structural parts and semi-finished products, auxiliary materials, and turnover materials and the rental costs of the raw materials, components, fittings and semi-finished products, auxiliary materials, which are included in the budget. Mechanical use fees refer to the contents of the quota included in the budget, the mechanical use fees incurred in the construction process and the rental fees of the construction machinery leased by the outside units, and the fees for installation, disassembly and entry and exit
Q:What are the total cost of the project?
Direct costs include direct project costs (labor costs, material costs, construction machinery costs) and measures fee (environmental protection fees, civilized construction costs, safe construction fees, temporary facility fee, night construction fee, two handling fee, large machinery and equipment import and field installation, concrete reinforced concrete template and support fee scaffolding fee, finished project and equipment protection fees, construction fees) precipitation drainage.
Q:Do you mind if I operate heavy machinery under the influence of you?
Strange out there questions deserve strange out there answers :) so here goes, no I don't mind if you don't mind operating soft toys under me ha ha ha
Q:why did a had a nightmare about tools and machinery and a school that i am dont have?
School - a dream about school may simply reflect an experience you've had there Machine/Machinery - you may feel like a machine, doing the same things over and over, and may point to work done by your subconscious Nightmare - merely reflects what's on your mind, try not to let it scare you Overall: You didn't like school and are now remembering your dislike, which may be the result of school-related news. You might also dread continuing education. Hope this helps!
Q:Chinese people make world class high tech machinery, so are their cars any good?
They okorder.com/ Sorry, but this little bug of a car is not cute!
Q:what would be the cost of plastic recycling machinery ?
Most companies sell these machines in orders (5-10 machine shipping). One single machine costs Rs. 185,000. By the way you have to buy the washing machine separately.
Q:Heavy machinery training?
That really depends where you work. Big mines you can be making over $60 per hour. I'd say $18-$25 per hour is more average.
Q:Antique Farm Machinery-What is it?
can you identify the manufacturer? McCormick, McCormick Farm-all was one of the earliest manufacturers of farm machinery, you may find flecks or red paint. there should be identifying marks, google the manufacturer, who ever it is. It should work freely; if it is as old as i am thinking it was made of cast iron.
Q:Measure Power usage in industry machinery?
If it runs on demand, whatever you put down will be correct. Let them prove you wrong! Or you could guestimate how long they are used each day and take the nameplate power rating off the machine, then do the math.
Q:Why is it so important that the translation machinery recognize the correct reading frame?
C. Translating in the wrong frame causes mutations

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range