• HDL5160THB(24m),Chassis Model SINOTRUF ZZ1161M5011C System 1
HDL5160THB(24m),Chassis Model SINOTRUF ZZ1161M5011C

HDL5160THB(24m),Chassis Model SINOTRUF ZZ1161M5011C

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 SPEC

Chassis ModelSINOTRUF ZZ1161M5011C
Emission StageTier III
Engine rated Power213 kW @ 2,200 rpm
Concrete Output110/65 m3/h
Concrete Pressure7/12 MPa
Max. Vertical Reach23.1 m
Main Hydraulic Pump Displacement190 ml/r
Concrete Slump120-230 mm

FEATURES

Operator safety and comfort

  • Closed loop hydraulic system reduces noise and vibrations for greater safety, stability and comfort. Remote, cable and Local control modes for convenience featuring  emergency stop for greater safety. 


  • Comprehensive error monitoring system with alerts to wireless remote for real-time monitoring.


  • GPS monitoring allows data and position monitoring from remote locations.

ReliableEasy to Maintain

  • Block distributor ensures lubricating points get proper amount of grease.


  • Maintenance free hydraulic valves from Rexroth  and Vickers.


  • Automatic piston retraction make maintenance easy.


  • Convenient placement of key maintenance points.


  • Parts, service and attachments you can count on.

 

  • Electric components from SIEMENS and OMRON.


  • Mercedes and ISUZU truck chassis for reliability and performance.


  • World class components used for key systems. 


  • V-shaped waterproof hydraulic seals prevent the hydraulic oil from being emulsified.

Built for Efficiency

  • Low fuel consumption and environmentally friendly truck chassis from world class suppliers like Mercedes Benz. 


  • Parallel hydraulic systems allow legs to open on both sides simultaneously.


  • Big bore concrete cylinder and streamlined hopper maximize concrete feeding efficiency.

Q: 1.Vibrator road roller, 2.Excavator(lt / tata hitachi), 3.Dozer, 4.Concrete vibrator, 5.Plate compactor, 6.Dumper7.Dozer, 8.Truck(full body), 9. Truck (407), 10.Tar boiler
Just like cars depends on the size of the machine. Is the Dozer a D11 or is it a D3? Is the truck a Toyota Tacoma or is it Peterbilt 357? What are you hauling? What size Engine? What climates are you operating at? Is the job site full of hills and what material are you working with?
Q: In what ways did the increased use of machinery affect workers and working conditions?
Workers production increased a thousand-fold
Q: looking for experience technical support for engraving & cutting machinery for advise.?
you can go to your nearby locksmith or supermarket asking arnd.
Q: I am involved in assessing equipment for a vehicle refurbishment workshop like lathe ,milling machine, crankshaft re grinder and so on.How old should these machines be to be considered obsolete(years)?Thanks
Something is only obsolete when you no longer have a use for it. As long as everything is in safe, working order and performs a useful function, it is not obselete. For woodworking, I still use large wooden clamps with wooden screws. They've gotta be like 30 years old, but they do exactly what I need them to do. If I got a strong, metal clamp, then the wooden one would be obsolete. Only replace what you need to replace.
Q: What is the management of construction machinery?
This should be the member of the eight members of the inside of the construction machinery to do, (1) seriously implement the guidelines, policies and regulations concerning the management of state and construction machinery construction enterprises;
Q: the flow for the maintenance procedure of a machinery starts from technician's procedure untill reach the management department for the maintenance implementation and deal between the spareparts suppliers??
Clarify your question please. I don't know what you are asking.
Q: The project, however, will end after 5 years. If the equipment can be sold for $4.5 million at the completion of the project, and your firm's tax rate is 35 percent, what is the after-tax cash flow from the sale of the machinery?
What formulas have you tried? It appears as though you are just trying to get everyone on here solve the finance problems for you!
Q: On 1st January, 2000 a firm purchased machinery worth Rs.100,000. On 1st September, 2002 it buys additional machinery worth Rs.27,000 and spends Rs.3,000 on its erection. The Accounts are closed each year on 31st December. Depreciation is written off 15% p.a. using Straight Line Method. You are required to prepare a Machinery Account for five years.
1.1.2000 Purchased machinery $100,000 Depreciation for 2000 $15,000 Nbv 31.12.2000 $85,000 Depreciation for 2001 $15,000 Nbv 31.12.2001 $70,000 1.9.2002 Purchased new machinery $30,000 Depreciation for 2002 $16,500 Nbv 31.12.2002 $83,500 Depreciation for 2003 $19,500 Nbv 31.12.2003 $64,000 Depreciation for 2004 $19,500 Nbv 31.12.2004 $44,500 Depreciation for 2005 $19,500 Nbv 31.12.2005 $25,000* *this nbv comprises $10,000 of the old machine and $15,000 of the new machine.
Q: Any known malfunctions on surgical machineries?
Regardless of the dangers from the surgical robot, many people still flock to hospitals that provide medication and treatments using the surgical machinery. Based on studies, this might be because patients have a tendency to think about the marketing guides of hospitals on their own websites as seen on medical health advice from doctors.
Q: I hadn't had any back up or otherwise
teleport back in time before the crash

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords