Cable Tray Z140
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5ton m.t.
- Supply Capability:
- 10000 ton/year m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cable Tray, Perforated Cable Tray, stainless steel cabletray of Cable Tray Z140
Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty.
Features of Cable Tray Z140
-- Increase the current carrying capacity of cables
-- Takes up to 25 percent less space than ladder
-- Hole pattern designed to provide maximum flexibility for positioning cable ties
-- Speed of installation
Specification of Cable Tray Z140
-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)
-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)
-- Width: 50 mm - 900 mm
-- Length: 2-6M (can be produced according to appointed length)
-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating
Range |
Height |
Width |
Thickness |
Light Duty Cable Tray |
15-20 |
50 - 900 |
0.8 – 2.0 |
Medium Duty Cable Tray |
25 |
50 - 900 |
1.0-2.0 |
Heavy Duty Cable Tray |
≥35 |
50 - 900 |
1.0-2.0 |
Other Shapes & Sizes Are Available Upon Request.
- Q: What machinery is required to make wire and cable?
- Oh, the pipeline is poured before the layout according to the design drawings.
- Q: IPadmini. The latest version 7.1.1 up in the morning to see the non-stop display this cable is not certified does not support this feature. The The Charger original. Not on the computer charge. The Ask God to answer more
- The problem lies in the charger between the machine, IPAD charging is to a charging protocol to complete, when the IPAD did not receive the agreement signal will be prompted: do not support this accessory, Apple's products have charging protocol, charging Is through the data line in the two lines and IPAD transmission charging protocol signal when ipad received the charging protocol signal after the machine internal charging circuit began to open the internal charging circuit to charge, the problem is to accept the charge signal is not so prompted not to Support, change the line to try
- Q: Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria...........................
- Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
- Q: What is the difference between wires and cables?
- The introduction of the device in the form of: sealing ring (sealing ring is to achieve the required protection level of the shell and the use of cash-saving brush to help find the silent material or elastic material parts) type of introduction device; casting solidified packing seal Type introduction device; metal seal ring introduction device
- Q: Decoration when the purchase of water pipes, wires and other items included in the account
- KVV is the control cable, generally do industrial control; and RVS is twisted pair, generally used for weak system, to eliminate the interference requirements of the occasion, such as two-wire bus system, specifically, the electrical fire bus more Such as RS485 bus and so on.
- Q: Apple 6 Charging Why always show this cable has not yet been certified
- Set-top box with the AV cable connection: yellow - video, red and white - audio, corresponding to the TV's AV input interface can be connected (do not receive the TV component interface). As for the emergence of partial pink, the possible reasons are: . poor contact. You will re-connect the three-color AV cable to the set-top box, on the TV, to ensure good contact. . cable quality. Three-color AV cable may not be the quality, if you can replace a group of try, or use the DVD and other equipment connected with the TV to test the AV line with or without problems. . TV AV input failure. You can use other video source equipment connected to the TV test, such as: DVD, VCD machines and so on. . set-top box failure. May be set-top box AV output port problems, if there are multiple sets of AV output, you can try other port okay, not the case may be the quality of set-top box, call customer service it.
- Q: Wire and cable model ZD what does it mean
- Wire pipe water problem: In fact, this problem is very serious, then this line should be scrapped or replaced, if you continue to reluctantly use not only to bring you the safety of trouble and the insulation of the wire dropped sharply! Because there is water it will lead to internal leakage can also make the wire heat caused by wire burning and trivial trivial accident, so be sure to take the necessary replacement! Supplement: the wire out of all, with the wire to grab the absorbent gauze and the like back to the twitching, many times for the gauze to dry the water, hair dryer toward the tube to heat the tube to dry and then re-layout of the new line.
- Q: Why does the bird stand on the wire without anything, but if people touch it,
- National standard line, no problem. Do not pick up the heater in winter. If not the national standard line, that copper is not easy to go wrong, then use, from time to time touch the line is not hot, there is no problem.
- Q: This cable or accessory has not been certified and may not be able to work with this iphone reliably
- The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
- Q: What are the T and T, s of the wire and cable test type?
- The expression is not very clear, it should be said to wear a tube, if a single wear on the line 100. Outside diameter 60mm.
1. Manufacturer Overview
Location | Shandong,China |
Year Established | 2001 |
Annual Output Value | Above US$150 Million |
Main Markets | Mid East;Western Europe;North America,South Asia |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Qingdao |
Export Percentage | 90% |
No.of Employees in Trade Department | 30 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above 150,000 square meters |
No. of Production Lines | Above 5 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Cable Tray Z140
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5ton m.t.
- Supply Capability:
- 10000 ton/year m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches