Wedge Pin Scaffolding System with Cheapest Price CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: XMWY-0001

  • Material: Q235/Q345

  • Component: Standard, Base Collar, Ledger, Diagonal

  • Technology: Automatic Welding, Punching, Casting

  • surface treatment: electrophoretic painting / galvanized

  • Installation: easy & quick

  • Quality: European Standard

  • Height: adjustable

  • Reused: at least 6 years

  • Certification: ISO 9001,ISO18001,ISO14001

  • Market: worldwide

2.Packaging & Delivery

Packaging Details:

Delivery Detail:

steel bracket / suitable for shipment

15-20 days

Wedge Pin Scaffolding System with Cheapest Price CNBM

Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

3.Feature:

1.Quick erection with one-man assembly

2.Safe and simple structure

3.Economic and versatile design

4.Widely used in construction

5.No loose parts

6.Maintenance free      

4.Product details: 


               XM Ring Lock scaffolding system

Scaffolding parts

Specification(mm)


Load capacity

(KN)/sqm

Vertical/standard

1000*48.3*3.2


40.75

1500*48.3*3.2


34.35

2000*48.3*3.2


29.75

2500*48.3*3.2


26.85

3000*48.5*3.2


24.75

Ledger/horizontal

600*48.3*3.2


50.15

900*48.3*3.2


48.35

1200*48.3*3.2


46.55

1800*48.3*3.2


44.95

2000*48.3*3.2


44.55

2500*48.3*3.2


30.25

3000*48.3*3.2


28.65

Diagonal brace

2000*1200*48*2.5


43.65

2000*1800*48*2.5


42.35

2000*2000*48*2.5


41.25

2000*2500*48*2.5


39.55

2000*3000*48*2.5


36.75

Base collar

280*48.3/60*3.2


51.23

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the bamboo board for the scaffolding of the building?
Wooden foot Shouban, bamboo scaffold (including bamboo string board, bamboo fence board) Involving the scaffolding of the main norms are "construction fastener steel scaffold safety technical specifications" JGJ130- "construction scaffolding safety technical specifications" JGJ164-2008 and so on.
Q:What are the measures in the rainy season? What precautions must be done?
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:A 54.5 kg painter is on a uniform 23.0 kg scaffold supported from above by ropes .?
I am looking for as shown, as I am not psychic.
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:On the issue of compensation after the event of force majeure
It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.
Q:Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range