Ring-lock Scaffolding with High Efficiency and Reliable Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
500 set
Supply Capability:
40000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Cup-lock Scaffolding

 

A support system for construction, owns advantages of both cup-lock scaffolding and shoring tower. It is in the development direction of new type scaffolding. It is widely used in buildings, bridges, tunnels etc.

Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.

Product Name: Scaffolding Light Duty Shoring Prop Systems

Model Number: QS-L-1000/1700/1900/2000/2200.

 

2.Main Features of Cup-lock Scaffolding

 

Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.

Easy to storage and transportation.

Made By 48mm Diameter inner tube/56mm Diameter outer tube.

Made By 40mm Diameter inner tube/48mm Diameter outer tube.

Size Available:

1000mm(Min)--1800mm(Max)

1700mm(Min)--3000mm(Max)

1900mm(Min)--3500mm(Max)

2000mm(Min)--3600mm(Max)

3200mm(Min)--4000mm(Max)

 

 

3.Cup-lock Scaffolding Images

 

 

 

 

 

4.Cup-lock Scaffolding Specification

 

Type

Adjustable Length
 (mm)

Outer Tube
 (mm)

Inner Tube
 (mm)

Weight
 (kgs)

20ft Container
 (pcs)

Surface Treatment

Spanish Prop

800-1400

48*1.6*765

40*1.8*835

4.74

3500

Painted,   powder coated, electro galvanized or hot dip galvanized

1600-3000

48*1.6*1600

40*1.8*1600

7.57

2200

2000-3500

48*1.6*1710

40*1.8*2000

8.45

2000

2200-4000

48*1.6*2000

40*1.8*2200

9.32

1750

Italian Prop

1800-3100

56*1.6*1510

48*1.8*1800

9.36

2100

2000-3600

56*1.6*1750

48*1.8*2000

10.29

2000

2200-4000

56*1.6*2010

48*1.8*2200

11.26

1750

Middle East or German Prop

1400-2700

60*2.0*1340

48*2.0*1400

9.45

2300

2000-3500

60*2.0*1540

48*2.0*2000

11.38

2000

2200-4000

60*2.0*1840

48*2.0*2200

12.7

1750

3000-5500

60*2.0*2540

48*2.0*3000

16.51

1500(40ft)

 

 

5.FAQ OF Cup-lock Scaffolding

What promises can be done by us?

 If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

 If printing required, please advise asap because the whole set need much more time to complete.

 Please DO check goods when courier knocks your door and contact us asap if any issue.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the measures in the rainy season? What precautions must be done?
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
Q:I would like to inquire cup lock system scaffolding, how much time per square meter and manpower to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:would it be weird if the scaffold piercing was the only ear piecing i had?
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
Q:significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
Q:Will the concrete cloth machine and the tower crane is different, long quite like
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range