Ring-lock Scaffolding with High Efficiency and Reliable Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
500 set
Supply Capability:
40000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Cup-lock Scaffolding

 

A support system for construction, owns advantages of both cup-lock scaffolding and shoring tower. It is in the development direction of new type scaffolding. It is widely used in buildings, bridges, tunnels etc.

Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.

Product Name: Scaffolding Light Duty Shoring Prop Systems

Model Number: QS-L-1000/1700/1900/2000/2200.

 

2.Main Features of Cup-lock Scaffolding

 

Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.

Easy to storage and transportation.

Made By 48mm Diameter inner tube/56mm Diameter outer tube.

Made By 40mm Diameter inner tube/48mm Diameter outer tube.

Size Available:

1000mm(Min)--1800mm(Max)

1700mm(Min)--3000mm(Max)

1900mm(Min)--3500mm(Max)

2000mm(Min)--3600mm(Max)

3200mm(Min)--4000mm(Max)

 

 

3.Cup-lock Scaffolding Images

 

 

 

 

 

4.Cup-lock Scaffolding Specification

 

Type

Adjustable Length
 (mm)

Outer Tube
 (mm)

Inner Tube
 (mm)

Weight
 (kgs)

20ft Container
 (pcs)

Surface Treatment

Spanish Prop

800-1400

48*1.6*765

40*1.8*835

4.74

3500

Painted,   powder coated, electro galvanized or hot dip galvanized

1600-3000

48*1.6*1600

40*1.8*1600

7.57

2200

2000-3500

48*1.6*1710

40*1.8*2000

8.45

2000

2200-4000

48*1.6*2000

40*1.8*2200

9.32

1750

Italian Prop

1800-3100

56*1.6*1510

48*1.8*1800

9.36

2100

2000-3600

56*1.6*1750

48*1.8*2000

10.29

2000

2200-4000

56*1.6*2010

48*1.8*2200

11.26

1750

Middle East or German Prop

1400-2700

60*2.0*1340

48*2.0*1400

9.45

2300

2000-3500

60*2.0*1540

48*2.0*2000

11.38

2000

2200-4000

60*2.0*1840

48*2.0*2200

12.7

1750

3000-5500

60*2.0*2540

48*2.0*3000

16.51

1500(40ft)

 

 

5.FAQ OF Cup-lock Scaffolding

What promises can be done by us?

 If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

 If printing required, please advise asap because the whole set need much more time to complete.

 Please DO check goods when courier knocks your door and contact us asap if any issue.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the measures in the rainy season? What precautions must be done?
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q:How to calculate the amount of steel pipe Pay attention to meters as a unit, or tons of units! Thank you
Look at how many holes are needed with a few meters of steel pipe
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range