Adjustable scaffolding props
- Ref Price:
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 180000 pc/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
可调节钢支撑
2.2-3.9M
内管:48*2.0*2200mm
外管:60*2.0*1850mm
花盘:120*120*5mm
销子:12直销
重量:11.2kg +/-5%
表面处理:预镀锌
- Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
- reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
- Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q:On the issue of compensation after the event of force majeure
- If the rain will be the construction of the road also washed away, then the road and repair costs borne by the owners There is a principle, "who is the child who is going," the engineering entity itself is the owner of this needless to say; the scene of the material is also the owner of the stack; the road would have been "seven links and one leveling" content, ; Required engineers to stay in the construction site necessary management and security personnel are owners of the requirements of the engineers, should belong to the owners But scaffolding is a technical measure, you should bear Such a look, is not clear how much ah
- Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
- Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
- Q:What is the vertical transport of construction and the high increase in fees
- In the contract of the project, the construction unit is paid a fee for the construction unit
- Q:Why the height increase of ten centimeters increase in housing ten percent
- Jian'an cost is the cost of housing construction and housing equipment installation costs for short
- Q:the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q:What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
- Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Hot Searches
Related keywords
You Might Also Like