• U Section Door Edge Moulding with Candy Strip Red and White Colour System 1
U Section Door Edge Moulding with Candy Strip Red and White Colour

U Section Door Edge Moulding with Candy Strip Red and White Colour

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
25 Rolls roll
Supply Capability:
100000 Rolls per Day roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Information:

Construction:

Virgin PVC and double sided adhesive

 

Description

Edge Guard--Protect your car door from dings and chips by installing door edge guards and car door trim from Brand sport. Our car door guards are available in clear,chrome, or a veritable rainbow of colors that can match any color on your car.

 

Usage

1. Used for car decorations

2.Designed for the attachment of a wide variety of automotive exterior and interior trim including body side moldings, claddings, rock panel trim,wheel flares, bumper trim and most other automotive trim.

For car interior protection and beautify.

 

Feature:

Virgin PVC core and double side tape. Not only provide protection, it will give you vehicle that top-of-the-line look. Give your vehicle a new upgrade with our custom trim body molding in factory and universal style.

 

Use Tips:

1. Cleaning up where it is to be installed, there shold be no wax or oil residual;

2. It should be used over 18, the surface of the gum should be heated with hot air whenever it is below the temperature to ensure the effect adhesiveness;

3. Avoid to wash the car with automative washing machine within 24 hrs after installing;

4. If what you bought is the type attached with an END, the length of the END should be deducted before cutting, and adhere the END after completing the adhering of the trim.

 

Note:

>Specification can be changed according to customer's need

>All side trim moldings are OEM quality, backed with 3M adhesive and are easy to install.

>We also have aluminum rivet-on channel molding and colored insert trim used for  door moldings and car side moldings.

>Various packing available depending on customer's request.

Q:2400 yuan, assembled a host, what kind of configuration can be installed ah! Play games, multiply! Note: is the whole host!
CD-ROM punctuation to promote the nuclear piggy bank is too hard to accept the TV can not receive the idea of it, do not do DVD manufacturers are not closed down. But you can use it to listen to CD. The audio cable is plugged into the front audio jack.
Q:I would like to open a 50 computer around the Internet cafes, I do not understand, please help out with friends to see what configuration and things
This kind of instrument called: "cable detector" well-known imported brands are "Fluke" model is: fluke2042 cable detector price: between 2820-3500 yuan; used before, feeling good is too expensive to buy too expensive
Q:What is the meaning of structured cabling systems?
You sometimes with the store owner said self-sealing plastic bags, they do not necessarily understand Oh Like this kind of goods, then generally in the office supplies can be seen where the place, this is not only loaded with food, and sometimes try to put the pen like a leather and so on and this kind of similar there is With the people who sell plastic bags can also say to buy
Q:Garage electric door installation need to pay attention to what the problem
USB extension cable is too long about 6 meters, the resistance will be too large. Usb line length seems to be 5 meters, 4 transit, 127 devices. But there is a usbhub with power.
Q:Newly bought a Dell notebook with a drive disk?
USB cable is too long, the signal is too weak, the voltage can be alone for the two head can be, no effect on the computer.
Q:After the computer starts, the desktop does not have any icons, and the mouse left and right keys did not respond, how do?
To ensure that the bridge full length of the location of not less than 2 of the ground - the ground can be laid along the cable to the ground, it can be in the distribution room, electric wells reserved for the ground terminal. To do this has been to meet the requirements of the bridge grounding. But the bridge itself is only to meet the grounding requirements, the bridge itself can not be used as the grounding of other equipment. If the equipment to ground, you need to lay the ground to the equipment, so that equipment can be connected to the ground. This ground can be a core of five-core cable, but also a separate bridge along the laying of a dedicated ground flat steel.
Q:Our power station is 2 * 3.8MW hydropower generating units, we have now provided the host equipment, guests asked us to provide ventilation and air conditioning system design. My question is as follows: 1) If we need to design this ventilation air conditioning system, we need to give guests what data, indoor and outdoor temperature or whatever. 2) need not need central air conditioning, or other places do not need air conditioning, only the control room to install air conditioning on it. 3) those places need to use axial fans, those places need to use centrifugal fans, or the need for other fans. 4) The drive motor of these fans has a agreed control system, the contactor switch together, that is, the motor control center. 5) because we are not the design unit, and foreign guests do not have a fixed design unit, I would like to ask what units in the country to help us to design better. Trouble description unit name. Welcome to join Q exchange. More
. no need to customers to data, as a design side, the customer chose you is that you are the authority. So you need to solve these problems for customers. . only in the office area and control is to install air conditioning can be. . depending on the circumstances, as a quiet place to choose a higher price of the fan. There is no need for decibels to use other fans. As for the axial fan and centrifugal fan that high noise you should understand it. . the ordinary fan drive motor is useless control system. Unless customized. It is recommended to use contactor remote control. . many domestic design units have, if the hydropower station like to find a proposal. There are a lot of individuals are doing part-time, if you want to contact can find me.
Q:Our teacher asked us to draw the building of the integrated wiring diagram, please draw what the essentials? How to start? What is the picture to be detailed? More
The main room is to look at the relocation of the engine room environment and management, security and speed of these several on the line. Environment: mainly to see if there is no temperature, humidity monitoring, whether within a reasonable range; into the staff after the strict management, wearing a shoe cover and overalls dress conditions; floor, etc. is anti-static; server placement and cable finishing The whole is not neat, etc., which can see the overall level of the engine room. Security: there is no hardware firewall, fire settings are complete or not. Speed: according to the need to choose whether the BGP multi-line room, so that managers provide an IP test speed and so on. In addition you can see or ask what kind of company in the rental of such a room, big companies, well-known companies and more, I put the server that layer of the room, a large are Panasonic branch, and Other well-known brands, if it is a very small company, it means that the engine room may be mismanaged or chaotic, if someone using the server to provide illegal services, may cause the entire network problems, thus affecting your server and network stability.
Q:Boot fan after the normal rotation, the screen does not show, the keyboard is not bright, forced shutdown and then boot everything is normal every time this is the case .. For example, I now shut down after the normal boot screen did not show. .More
Unplug the hard drive to see if you can in the past should be hard disk is broken, there may be no needles reset.
Q:5000 + Gigabyte 770 motherboard hd3850 memory Kingston 2G250G Seagate I usually have the Internet temperature between 60 to 70 degrees, playing the game reached 90 degrees ....... Is it the motherboard problem? The , Can not burn ah, I see other people's motherboards are more than 50 degrees, I use the optimization of the master test, just when the boot time more than 40 degrees.I do not dare to play the game, the higher the CPU usage, The temperature on the sharp rise, we help out the question added: I started after the application has been started fish fish desktop timer shutdown, virtual drive, nod. 360 and these procedures should not be concerned I do not know the optimization master is what the motherboard Place the temperature ah more
To know what the patch panel is doing, you first have to know what is the vertical subsystem and the level of subsystems
We have the state-of-art technology and equipment as well as an excellent team of experienced workers. Our goal is "to supply good quality and satisfactory products to our customers". with the outstanding technology, we have been developing rapidly. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2010
Annual Output Value
Main Markets 16.67% North America
16.67% Eastern Europe
16.67% Southeast Asia
16.67% Mid East
16.67% Eastern Asia
10.00% Western Europe
Company Certifications SGS Approval

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port HUANGPU,SHEKOU,YANTIAN
Export Percentage 21% - 30%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, Russian
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products