Top Cross Rail of Light Steel Top Cross Rail of Light Steel

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
3000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ceiling channel and drywall channel, made of high-quality Snowflakes Steel

Product Applications:

 

Product used for internal constructions gypsum drywall partition such as hotels, terminal building,

bus station, theatres, shopping malls, factories, office buildings, and etc.

 

Product used for internal constructions gypsum drywall partition such as hotels, terminal building,

bus station, theatres, shopping malls, factories, office buildings, and etc.

 

Product used for internal constructions gypsum drywall partition such as hotels, terminal building,

bus station, theatres, shopping malls, factories, office buildings, and etc.

 

Product Advantages:

 

1.Light,good strength,cauterization resistance and water resistance

2.Matching magnesium fire-proof board,gypsum board and many other wall and ceiling board

3.Moisure-proof ,shock-resistant,high-effcient and environmentally-friendly

4.Easy and fast for installation,time-saving

5. Prompt delivery, high quality ,competitive price and complete sets of styles

6.We can supply you the products based on your specific requirements

 

Main Product Features:

(1) Lightweight  and high strength: 3-4 kg/m2 (1/10 of half brick wall), with yield strength 400mpa.

(2) Environment-friendly : galvanized steel-no radiation, have no harm to our health and not pollute the environment.

(3) Products with fillisters : Setting some fillisters in both sides of the keels in a selective way, in order to strength the

keels' vertical points and intensity.

(4)  Various sizes of metal track and metal stud : we are able to manufacture German, Japan and Aus-American types etc..

We can meet your customized demands.

Product Specifications:

Track Roll Forming Machine Ud  Cd  Uw Cw Profiles

Images:

Top Cross Rail of Light Steel Top Cross Rail of Light Steel

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The difference between light steel keel ceiling and macadam ceiling
The former light weight, you can easily hang a variety of modeling top, which is estimated that no advantage, weight heavier, install trouble, etc.!
Q:Gypsum board ceiling side keel with a good side of the wood or supporting the light keel edge keel good?
The edge of the wood keel good
Q:Light steel keel ceiling and wood keel ceiling What is the difference between ah!
The difference between them is a light steel dragon skeleton. Fire performance is strong. Is a flame retardant material. But in the just equipment is not easy to correct. But the tooling class is not demanding. So it is the best choice .. the future is not easy to deformation .. General For the decoration of the tooling category, the public place when the decoration is light steel keel, wood keel, then fire on the .. wood keel mostly used in home decoration,
Q:Light steel keel ceiling need to pay attention to what issues?
Light steel keel ceiling works in the construction of the need to pay attention to the following main aspects:     1, ceiling elevation, size, from the arch and shape should meet the design requirements.     2, the finishes of the material, variety, specifications, patterns and colors should meet the design requirements.     3, dark keel ceiling works of the boom, keel and finishes the material must be installed firmly.     4, boom, keel material, specifications, installation spacing and connection should meet the design requirements. Metal boom, keel should be treated by surface corrosion; wood boom, keel should be anti-corrosion, fire treatment.     5, gypsum board seams should be based on their construction technology standards slab crack treatment. Installation of double gypsum board, the surface plate and the base plate of the joints should be staggered, and not in the same keel on the seam.     6, the surface material should be clean surface, consistent color, no warping, cracks and defects. The bars should be straight and wide     Cause     7, decorative panels on the lamps, smoke detectors, sprinklers, tuitas and other equipment, such as the location should be reasonable, beautiful, and the decorative panels should be consistent, close.     8, metal boom, keel joints should be uniform, corners should be anastomosis, the surface should be flat, no warping, hammer India. Wooden boom, keel should be straight, no split, deformation.     9, ceiling filled with sound-absorbing material varieties and laying thickness should meet the design requirements, and should be anti-scattered measures.     Details can be found in "GB50210-2001 building decoration works construction quality acceptance norms" in Section 6.2 "dark keel ceiling project" and Section 6.3 "Ming kei ceiling project" in the relevant provisions.
Q:Attic light steel keel gypsum board ceiling construction drawings how to draw?
To draw one or several sections, to express the steeple tilt angle and internal structure (light steel keel plus gypsum board) on the line
Q:light steel keel gypsum board ceiling works
Local cracking Gong Guan folder pull the locust control Weihai even reason is the gypsum board between the seam is not handled well, no slot, no seam, seal gypsum is not dense, not paste the zipper and so will lead to cracking, when the hanging bar Not vertical, or hanging length of more than 1.5 meters and no anti-support, it will lead to local cracking. The quality of the main bone bones with the specifications of the construction are the factors that affect the cracking of gypsum board or not. Plaster layer off for many reasons, there are common plaster layer of the thickness of each layer is too thick, the grass is not dealt with the beginning of the batch of ash, the space is too large, the former plaster layer is not dry on the next wipe Gray, are the cause of the plaster layer off.
Q:Do steel keel ceiling, need to use white latex?
As if you can buy a roll of tape. Gypsum board gap filled with putty, with latex to crack the paper tape on the outside. Nails coated with anti-rust paint. Finally, the whole scraping putty. Before the people to do 400 square meters with a variety of woodworking, a total of half a barrel Big bucket
Q:Wood keel expensive or light steel keel expensive?
The cost of wood keel is higher than that of light steel keel. But the keel is more plastic than the light steel keel strong. So the wood keel to become more commonly used keel material.
Q:Ceiling twenty square meters need light steel keel how many roots
If the height of the room does not exceed 4 meters, usually: the main keel 1.2 meters, vice keel 4 meters (300MM open file), 1 meter pole, gypsum board 1.05 square (5% loss). Accessories too much here to do not introduce. The above calculation method is limited to flat top, if the shape plus 20% -30%
Q:Light steel keel paper gypsum board ceiling construction process
Operating conditions 1. Construction of the structure should be in the cast-in-place concrete floor or prefabricated concrete floor slab, according to the requirements of the radio, according to the embedded φ6 ~ φ10 reinforced mixed boom, shot without the requirements of the arrangement of large keel location embedded steel hanging Rod, the general spacing of why 900 ~ 1200mm. 2. When the wall of the ceiling room for the brick masonry, the elevation should be in the ceiling along the walls and columns around the masonry embedded wood preservative, along the wall spacing 900 ~ 1200mm, the column should not be buried on each side More than two pieces of wood. 3. Install the roof of the various pipelines and ventilation ducts, to determine the light, ventilation and a variety of exposed mouth position. 4. All kinds of materials all ready to prepare. 5. Ceiling cover panel should be installed before the wall, wet operation project. 6. Take the roof construction platform. 7. Light steel skeleton roof in a large area before the construction, should do the model between the roof of the crown, lamp, vents of the tectonic treatment, block and fixed method should be tested and approved by the approved before the big Area construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range