Timber Beam with High Effective Performance

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Timber Beam Wall Formwork Description 

 

Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

 

2. Main Features of Timber beam wall formworks

-convenient for construction 

-easy to control the quality

-easy, rapid and economical.

 

3. Timber beam wall formwork Images

 

Timber Beam with High Effective Performance

 

Timber Beam with High Effective Performance

 

4. Timber Beam Wall Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Wall Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.      

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who can give me a bowl buckle scaffold acceptance form?
Tighten the quality of fasteners should be 50% sampling rate, the pass rate should reach 100%;
Q:Bowl buckle scaffold can be used on any ground
This bowl buckle scaffold will be built more stable, reduce the probability of accidents
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
Double row scaffolding as the name implies, is composed of two rows of independent vertical rod through a small bar, a large bar member connected to the temporary bearing frame body, a common fastener tubular steel scaffolding, scaffolding, construction building frame periphery is currently the most common form of.
Q:What is the difference between the bowl buckle scaffold and the fastener scaffold?
(1) single row scaffolding (single row): only a row of pole end, horizontal bar on the scaffolding on the wall.(2) double row scaffolding (double frame): scaffold composed of inside and outside the two rows of the pole and the horizontal bar etc..(3) structural scaffolding: scaffolding for masonry and structural engineering operations.(4) decoration scaffolding: scaffolding for construction work.
Q:what pole size diameter will fit over a scaffolding pole?
scaffolding takes a 1 1/4 pin to connect them together so the o.d. on the buck itself would probably be 1 1/2 in...so are you sliding over the pin or the buck itself...my medium duty scaffolding takes a 1 1/8 th in. pin...
Q:I am considering getting an ear scaffolding, and was wondering, is it girly???
What the heck is ear scaffolding?
Q:SCAFFOLD PIERCING HELP PLEASE?
Itchiness is normal. Don't scratch it and make sure your hands are clean and all that good stuff whenever you touch it for cleaning purposes.
Q:How can i fing scaffolding turnarounds online?
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q:A window washer is standing on a scaffold?
Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
Q:Scaffolding Piercing swelling time?
Mine took about a week, but only the first 4/5 days were really bad. Taking something with ibuprofen or anything meant for swelling or an anti-inflammatory should help :) Don't try ice though, that just made it worse for mine.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range