Table Formwork with Best Quality and High Efficiency

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Table Formwork Description 

 

Table formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. 

 

2. Main Features of Table Formwork

 

     -For any storey heights and slab thickness.

     -Fast in transportation and concrete casting due to pre-assmebled table unit.
     -Thus save more than a half time & labor cost compared with TECON Slab Flex 20 formwork.
     -Can choose shoring props or towers according to different loadings and height.

 

3. Timber beam wall formwork Images

 

Table Formwork with Best Quality and High Efficiency

 

Table Formwork with Best Quality and High Efficiency

 

4. Timber Beam Wall Formwork Specifications

 

Basic unit sizes(width*length): 2m*4m / 2m*5m / 2.5m*4m / 2.5m*5m      
Main components:
-- 18mm/21mm brown film plywood;
-- Main beam - H20 timber beam(EN13377)
-- Secondary beam - H20 timber beam(EN13377);
-- Fixed or swivel table head for option
-- Shoring prop  (10KN/20KN/30KN loading capacity with 2.5m to 5m open length, HDG, EN1065)
-- Shoring tower bros (35KN/60KN loading capacity with extreme height, HDG)
-- Handrail post

 

5.FAQ of  Timber Beam Formwork

   

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built
Q:Does anyone know of a book on general Japanese history? I just need a scaffold.?
George Sansom has written a three-volume History of Japan that does a good job outlining the major historical issues. Don't let the fact that it's three volumes dissuade you. It's interesting and accurate.
Q:A 5.0-m long scaffold is 80 N. It hangs from wires at each end. A 200-N box sits 1.0 m from left. Tension?
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:Pankou galvanized scaffolding is very beautiful, I would like to ask the material and the characteristics of this shelf
Along with the new Pankou scaffolding erection characteristics of the rapid rise in the rapid support system in how to install?First we look at the popularity of related knowledge, also known as scaffolding, disc type, pin type scaffold, Rhea frame called in foreign countries, according to their use can be divided into two types of formwork support and scaffolding. At present, the domestic application is more common template support, as well as the decoration of the operation of the rack. We use the Tianjin nine Industrial Company Limited production of the socket type scaffold, for example:
Q:Cleaning my new scaffolding piercing?
No, squirting piercings with solution is never as beneficial as actually submerging them in the stuff. In my opinion, leaving the piercing alone and giving it sea salt soaks are the best methods for helping it heal.
Q:Bowl buckle scaffold can be used on any ground
This bowl buckle scaffold will be built more stable, reduce the probability of accidents
Q:Standard Specification for steel tubes for ladder type scaffolding
Galvanized steel pipe should be used DN40, according to the material of the rod is divided into: 1, a single steel pipe scaffolding. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5. 2, a variety of specifications of steel scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3, the steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. Scaffolding bowl buckle type steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using steel cross bar, for the "steel pipe based scaffold".
Q:when there is an alternative route to my back garden to put up scaffolding,?
Call your lawyer.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:Steel tube scaffolding construction labor time
And can be roughly divided as follows: 2.1 according to the material of the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold. 3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range