• Table Formwork with Best Quality and High Efficiency System 1
  • Table Formwork with Best Quality and High Efficiency System 2
Table Formwork with Best Quality and High Efficiency

Table Formwork with Best Quality and High Efficiency

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Table Formwork Description 

 

Table formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. 

 

2. Main Features of Table Formwork

 

     -For any storey heights and slab thickness.

     -Fast in transportation and concrete casting due to pre-assmebled table unit.
     -Thus save more than a half time & labor cost compared with TECON Slab Flex 20 formwork.
     -Can choose shoring props or towers according to different loadings and height.

 

3. Timber beam wall formwork Images

 

Table Formwork with Best Quality and High Efficiency

 

Table Formwork with Best Quality and High Efficiency

 

4. Timber Beam Wall Formwork Specifications

 

Basic unit sizes(width*length): 2m*4m / 2m*5m / 2.5m*4m / 2.5m*5m      
Main components:
-- 18mm/21mm brown film plywood;
-- Main beam - H20 timber beam(EN13377)
-- Secondary beam - H20 timber beam(EN13377);
-- Fixed or swivel table head for option
-- Shoring prop  (10KN/20KN/30KN loading capacity with 2.5m to 5m open length, HDG, EN1065)
-- Shoring tower bros (35KN/60KN loading capacity with extreme height, HDG)
-- Handrail post

 

5.FAQ of  Timber Beam Formwork

   

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Q:What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation;
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
think of statics (in terms of forces and torques): because of fact the gadget is in equilibrium, the sum of the forces = 0 and the sum of the torques = 0 on the grounds that sum of forces = 0, then: ft(left) + ft(suitable) - Fg(scaffold) - Fg(employee) = 0 on the grounds that sum of torques = 0, then: -Set some element as your axis of rotation. for my area, I set between the ft as my axis. to that end, my torque equation will become ft(suitable)(2.ninety m) – Fg(scaffold)(a million.40 5 m) – Fg(employee)(a million.ninety m) = 0 you already know Fg(scaffold), Fg(employee), so resolve for ft(suitable). Plug this value into the tension equation and resolve for ft(left).
Q:a. Climb the stairs to join Hester and Pearl. b. Give an encore sermon. c. Reveal the meaning of life. d. Rise Up to heaven.
e. do his own homework Only joking. It's definitely d. Or c.
Q:Where can I get my scaffold pierced in Glasgow?
Nirvana, in Chisholm St i would never go anywhere else i got all mine there and both my teen daughters got theirs there as well first class, perfect hygiene, VERY experienced and lovely staff john christine, especially
Q:All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
This Site Might Help You. RE: What's the story in March to the Scaffold? All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
Q:stands there.?(from the scarlet letter book.)
I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
Q:If the guillotine operator walked away from the scaffold where would he be headed?
lol, i have no answer for this...just laughter..
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.
Q:What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
What does the previous version mean? Once the new version comes out, the previous version is cancelled

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products