Ringlock Scaffolding System-Steel Single Horizontal Ledger CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: RS-SL

  • Material: Q235

  • Diameter: 48.3mm

  • Thickness: 3.25mm

  • Surface: Hot Dipped Galvanized

  • Minimum Order Quantity: 20 tons

  • Packaging Details: Steel Pallets

  • Certificate: CE

2.Packaging & Delivery

Packaging Details:Steel Pallets

3.Product Description

Model No: RS-L

4.Features:1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length 730mm, 1090mm,1570mm, 2070mm, 2570mm, 3070mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel or forged

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx4.0mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length 600mmx4.00mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Ringlock Scaffolding System-Steel Single Horizontal Ledger CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the scaffold steel pipe welded steel pipe welded pipe or iron
Safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199kN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable. 6 easy to process: the main component with 48 *, Q235B welded steel pipe, the manufacturing process is simple, the cost is moderate, can directly on the existing fastener type scaffolding processing transformation.
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:i walk almost all day long carrying heavy material and climb up and down scaffolding. is this a workout?
Yes!
Q:Does the Scaffold Ear Piercing Show?
you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
Q:15 and considering scaffolding (details in description)?
Surely it's logical to ask your uncle for advice
Q:Shear strength of steel tubular scaffold
The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
Q:Scaffold Piercing questions?
particular, you ought to use 2 seperate barbells, yet whilst it heals, the perspective might exchange you won't have the means to place the completed bar via. I purely have been given my scaffold piercing accomplished a pair of month in the past. For me, the soreness become not something, it did not harm in any respect. yet, the soreness is distinctive for each guy or woman. you may exchange the barbell after it heals to 2 seperate rings, in case you like. This piercing is alot to shelter yet i'm happy I have been given it. wish this facilitates.
Q:How much does a scaffold piercing hurt?
8 - 16 weeks - healing time. But with some people it can be alot longer! Clean 3 - 4 times a day. Try cleaning with a mix of tea tree oil and water! It doesn't hurt much :)
Q:Did the pageantry of pain at the scaffold actually deter people of crimes during the 18th century?
may have deterred some. but with no real police force, I imagine the chance of being caught was actually quite low.
Q:Scarlet letter Scaffold scenes?
There are obviously different printings of the Scarlet Letter, but I do remember this: 1st: Chp 2 2nd: Chp 12 3rd: Chp 23

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range